SH 78 at CR 550 in Farmersville
Collin County · est $2.1M
Collin County · est $2.1M
8 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | ELECNOR BELCO ELECTRIC, INC. | $1,754,724.00 | — |
| 2 | SICE, INC. | $1,991,344.06 | $236,620.06 |
| 3 | YUNEX LLC | $2,075,798.64 | $321,074.64 |
| 4 | WG ENGINEERING & CONSTRUCTION, LLC | $2,118,683.27 | $363,959.27 |
| 5 | DURABLE SPECIALTIES, INC. | $2,268,374.40 | $513,650.40 |
| 6 | FLORIDA TRAFFIC CONTROL DEVICES, INC. | $2,334,334.00 | $579,610.00 |
| 7 | HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, LLC | $2,365,026.13 | $610,302.13 |
| 8 | SELECT MAINTENANCE, L.L.C. | $2,494,545.49 | $739,821.49 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 680-7002 INSTALL HWY TRF SIG (ISOLATED) | 5 EA | $36,000 | $180k | 10% |
| 344-7001 SP MIXES SP-B PG64-22 | 799 TON | $202 | $161k | 9% |
| 6008-7001 RVDS (PRESENCE DETECTION ONLY) | 13 EA | $10,947 | $142k | 8% |
| 344-7011 SP MIXES SP-C SAC-B PG64-22 | 335 TON | $264 | $88k | 5% |
| 6008-7002 RVDS (ADVANCE DETECTION ONLY) | 9 EA | $8,413 | $76k | 4% |
| 100-7002 PREPARING ROW | 14 STA | $5,095 | $71k | 4% |
| 530-7007 DRIVEWAYS (CONC) (HES) | 475 SY | $139 | $66k | 4% |
| 416-7043 DRILL SHAFT (TRF SIG POLE) (30 IN) | 132 LF | $354 | $47k | 3% |
| 6007-7001 BBU SYSTEM (EXTERNAL BATTERY CABINET) | 5 EA | $9,344 | $47k | 3% |
| 505-7001 TMA (STATIONARY) | 160 DAY | $263 | $42k | 2% |