Abilene FY 2027 BPM
Taylor County · est $937k
Taylor County · est $937k
12 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | BLACKSMITH VENTURES LLC | $685,424.00 | — |
| 2 | MACIAS SPECIALTY CONTRACTING LLC | $732,093.00 | $46,669.00 |
| 3 | ROAD DOCTORS LLC | $820,200.00 | $134,776.00 |
| 4 | REAR CONTRACTORS LLC | $842,149.00 | $156,725.00 |
| 5 | GARRET SHIELDS INFRASTRUCTURE | $883,730.00 | $198,306.00 |
| 6 | TI-ZACK CONCRETE, LLC | $890,709.50 | $205,285.50 |
| 7 | STRUCTURAL INTEGRITY GROUP LLC | $901,634.00 | $216,210.00 |
| 8 | SCOTT TUCKER CONSTRUCTION COMPANY, LLC | $936,075.00 | $250,651.00 |
| 9 | CROSS PLUS CONSTRUCTION, LLC | $949,481.50 | $264,057.50 |
| 10 | MPB, INC. | $1,013,487.00 | $328,063.00 |
| 11 | PREMIER CONTRACTORS LLC | $1,114,479.00 | $429,055.00 |
| 12 | THE TRUESDELL CORPORATION | $1,394,394.00 | $708,970.00 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 429-7007 CONC STR REPAIR (VERTICAL & OVERHEAD) | 2,760 SF | $127 | $351k | 51% |
| 432-7043 RIPRAP (STONE PROTECTION)(18 IN) | 531 CY | $208 | $110k | 16% |
| 429-7003 CONC STR REPAIR(DECK REP(PART DEPTH)) | 810 SF | $115 | $93k | 14% |
| 420-7064 CL C CONC (COLUMN ENCASEMENT) | 47 CY | $1,500 | $71k | 10% |
| 505-7001 TMA (STATIONARY) | 64 DAY | $235 | $15k | 2% |
| 438-7007 CLEANING AND SEALING EXIST JOINTS (CL7) | 328 LF | $25 | $8k | 1% |
| 401-7001 FLOWABLE BACKFILL | 10 CY | $750 | $8k | 1% |
| 104-7027 REMOV CONC (COPING) | 20 LF | $300 | $6k | 1% |
| 420-7143 CL C CONC (COPING) | 20 LF | $300 | $6k | 1% |
| 104-7026 REMOV CONC (MSE PANELS) | 35 SF | $145 | $5k | 1% |