PB Ops/Maint Managed Lanes 771 0726
Dallas County · est $3.1M
Dallas County · est $3.1M
2 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | ROY JORGENSEN ASSOCIATES, INC. | $2,424,621.71 | — |
| 2 | DCS Asset Maintenance LLC | $3,989,583.10 | $1,564,961.39 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Bid tab · TxDOT
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 7105-7005 PERF BASED OPER & MAINT MANAGED LANES | 24 MO | $66,000 | $1.58M | 65% |
| 7105-7001 PARTIAL ABG REPLACEMENTS | 200 LF | $750 | $150k | 6% |
| 7105-7002 COMPLETE ABG REPLACEMENTS | 6 EA | $17,500 | $105k | 4% |
| 666-7236 RE PM TY III (W)(6")(SLD) | 86,255 LF | $0.9 | $78k | 3% |
| 7105-7003 REPLACE VAB SYSTEMS-NETS | 4 EA | $18,000 | $72k | 3% |
| 500-7015 MOBILIZATION (CALLOUT 13) | 39 EA | $1,500 | $59k | 2% |
| 427-7003 OPAQUE SEALER FINISH | 33,190 SF | $1 | $33k | 1% |
| 438-7010 CLEANING AND SEALING JOINTS (FOAM) | 800 LF | $40 | $32k | 1% |
| 774-7002 REPLACE (SMTC) NARROW | 10 EA | $2,500 | $25k | 1% |
| 658-7013 INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI) | 628 EA | $35 | $22k | 1% |