Montgomery County · est $1.2M
Montgomery County · est $1.2M
10 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | BK FIELD OPERATIONS LLC | $1,198,560.00 | — |
| 2 | ROY JORGENSEN ASSOCIATES, INC. | $1,351,475.00 | $152,915.00 |
| 3 | GARRET SHIELDS INFRASTRUCTURE | $1,369,000.00 | $170,440.00 |
| 4 | ISI CONTRACTING, INC. | $1,425,155.00 | $226,595.00 |
| 5 | STRUCTURAL INTEGRITY GROUP LLC | $1,445,705.00 | $247,145.00 |
| 6 | PATHFIELD INVESTMENTS LLC | $1,613,725.00 | $415,165.00 |
| 7 | FORDE CONSTRUCTION COMPANY, INC. | $1,633,835.00 | $435,275.00 |
| 8 | CASTILLO ARANDA LLC | $1,821,175.00 | $622,615.00 |
| 9 | TAYLOR BRIDGE LLC | $2,333,925.00 | $1,135,365.00 |
| 10 | BLACKSMITH VENTURES LLC | $2,723,450.00 | $1,524,890.00 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 432-7043 RIPRAP (STONE PROTECTION)(18 IN) | 2,620 CY | $190 | $498k | 42% |
| 432-7045 RIPRAP (STONE PROTECTION)(24 IN) | 705 CY | $190 | $134k | 11% |
| 438-7007 CLEANING AND SEALING EXIST JOINTS (CL7) | 3,000 LF | $42 | $126k | 11% |
| 429-7004 CONC STR REPAIR(RAPID DECK REP(PRT DPT) | 300 SF | $240 | $72k | 6% |
| 785-7005 BRIDGE JOINT REPAIR (SEJ) | 200 LF | $300 | $60k | 5% |
| 110-7002 EXCAV (CHANNEL) | 1,500 CY | $35 | $53k | 4% |
| 401-7002 FLOWABLE FILL (EMBANKMENT) | 175 CY | $300 | $53k | 4% |
| 735-7060 DRIFTWOOD REMOVAL | 1,075 CY | $40 | $43k | 4% |
| 400-7010 CEM STABIL BKFL | 150 CY | $240 | $36k | 3% |
| 429-7006 CONC STR REPR(RAPID DECK REP(FULL DPT)) | 100 SF | $325 | $33k |
| 3% |