Guardrail Dumas AE FY 26
Moore County · est $396k
Moore County · est $396k
2 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | E.V.G. ENTERPRISE | $376,352.00 | — |
| 2 | HJC FARMS, INC. | $447,509.00 | $71,157.00 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 770-7013 REM OBSOLETE GET & REPL W/ SGT | 50 EA | $4,000 | $200k | 53% |
| 770-7001 REPLACE RAIL ELEMENT (W-BEAM) | 3,500 LF | $27 | $95k | 25% |
| 770-7007 REPLACE STEEL POST W/O CONC FND | 250 EA | $190 | $48k |
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
| 13% |
| 770-7018 REPLACE BLOCKOUT | 400 EA | $35 | $14k | 4% |
| 770-7016 REPLACE SINGLE GDRAIL TERMINAL RAIL | 100 LF | $80 | $8k | 2% |
| 770-7020 RESET SGT IMPACT HEAD | 5 EA | $1,000 | $5k | 1% |
| 770-7009 REPLACE STEEL POST W/ CONC FND | 20 EA | $200 | $4k | 1% |
| 505-7001 TMA (STATIONARY) | 100 DAY | $10 | $1k | 0% |
| 770-7002 REPLACE RAIL ELEMENT (THRIE-BEAM) | 50 LF | $20 | $1k | 0% |
| 770-7003 REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM) | 50 EA | $20 | $1k | 0% |