Drainage Improvement FM 106
Cameron County · est $630k
Cameron County · est $630k
6 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | LUCANIA CONTRACTORS LLC | $383,573.34 | — |
| 2 | CLORE EQUIPMENT LLC | $565,068.09 | $181,494.75 |
| 3 | BLACKSMITH VENTURES LLC | $587,011.00 | $203,437.66 |
| 4 | CASTILLO ARANDA LLC | $645,730.00 | $262,156.66 |
| 5 | EARTHWORKS ENTERPRISE | $647,092.00 | $263,518.66 |
| 6 | ARTILLERY L.L.C. | $650,732.00 | $267,158.66 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 464-7007 RC PIPE (CL III)(30 IN) | 512 LF | $270 | $138k | 36% |
| 467-7346 SET (TY II) (30 IN) (RCP) (4: 1) (C) | 16 EA | $5,900 | $94k | 25% |
| 344-7064 SP MIXES SP-D SAC-A PG76-22 | 228 TON | $250 | $57k | 15% |
| 354-7018 PLANE & TEXT ASPH CONC PAV(1.5") | 2,666 SY | $10 | $27k | 7% |
| 400-7010 CEM STABIL BKFL | 189 CY | $100 | $19k | 5% |
| 276-7095 CM TRT(PT MX)(CL M)(TY E)(GR 4)(FN POS) | 52 CY | $300 | $16k | 4% |
| 400-7003 STRUCT EXCAV (PIPE) | 360 CY | $35 | $13k | 3% |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 1 MO | $6,500 | $7k | 2% |
| 666-7411 REFL PAV MRK TY I (W)6"(SLD)(100MIL) | 1,160 LF | $3.25 | $4k | 1% |
| 666-7420 REFL PAV MRK TY I (Y)6"(BRK)(100MIL) | 580 LF | $5.75 |
| $3k |
| 1% |