Mill and Inlay (South)
Brown County · est $1.5M
Brown County · est $1.5M
6 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | ALLEN KELLER COMPANY | $1,025,505.16 | — |
| 2 | BIG CREEK CONSTRUCTION, LTD. | $1,109,872.00 | $84,366.84 |
| 3 | CK NEWBERRY, LLC | $1,188,001.35 | $162,496.19 |
| 4 | TEXAS MATERIALS GROUP, INC. | $1,262,637.70 | $237,132.54 |
| 5 | LONE STAR PAVING COMPANY | $1,300,119.85 | $274,614.69 |
| 6 | BLACKSMITH VENTURES LLC | $1,654,414.00 | $628,908.84 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 344-7002 SP MIXES SP-B SAC-B PG64-22 | 4,469 TON | $106.21 | $475k | 46% |
| 344-7031 SP MIXES SP-C SAC-B PG76-22 | 3,032 TON | $116.81 | $354k | 35% |
| 500-7001 MOBILIZATION | 1 LS | $97,425 | $97k | 10% |
| 3007-7001 BONDING COURSE | 7,382 GAL | $3.64 | $27k | 3% |
| 354-7054 PLANE ASPH CONC PAV(5") | 26,365 SY | $0.94 | $25k | 2% |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 3 MO | $4,184 | $13k | 1% |
| 668-7108 PREFAB PM TY C (W)(RR XING) | 6 EA | $986.59 | $6k | 1% |
| 666-7423 REFL PAV MRK TY I (Y)6"(SLD)(100MIL) | 7,316 LF | $0.64 | $5k | 0% |
| 666-7411 REFL PAV MRK TY I (W)6"(SLD)(100MIL) | 6,832 LF | $0.64 | $4k | 0% |
| 668-7089 PREFAB PM TY C (W)(24")(SLD) | 215 LF | $13.5 | $3k |
| 0% |