FY26 - District Shortline -02
Brazos County · est $513k
Brazos County · est $513k
7 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | STRIPE LINES, INC. | $432,177.50 | — |
| 2 | STRIPE-A-ZONE, LLC | $453,295.00 | $21,117.50 |
| 3 | PROFESSIONAL TRAFFIC CONTROL LLC | $472,940.00 | $40,762.50 |
| 4 | PAVEMENT MARKINGS INC. | $507,520.00 | $75,342.50 |
| 5 | D. I. J. CONSTRUCTION, INC. | $612,795.00 | $180,617.50 |
| 6 | TRP INFRASTRUCTURE SERVICES, LLC | $637,912.50 | $205,735.00 |
| 7 | GREY SKY CONSTRUCTION LLC | $659,200.00 | $227,022.50 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 668-7089 PREFAB PM TY C (W)(24")(SLD) | 8,000 LF | $14 | $112k | 26% |
| 668-7103 PREFAB PM TY C (W)(WORD) | 250 EA | $210 | $53k | 12% |
| 668-7091 PREFAB PM TY C (W)(ARROW) | 250 EA | $200 | $50k | 12% |
| 668-7135 PREFAB PM TY C (MULTI)(SHIELD) | 18 EA | $2,500 | $45k | 10% |
| 500-7002 MOBILIZATION (CALLOUT) | 6 EA | $4,500 | $27k | 6% |
| 6024-7001 PREFORMED IN-LANE (TRANS) RUMBLE STRIP | 550 LF | $25 | $14k | 3% |
| 668-7110 PREFAB PM TY C (W)(18")(YLD TRI) | 410 EA | $32 | $13k | 3% |
| 677-7009 ELIM EXT PM & MRKS (ARROW) | 250 EA | $50 | $13k | 3% |
| 677-7015 ELIM EXT PM & MRKS (WORD) | 250 EA | $50 | $13k | 3% |
| 668-7100 PREFAB PM TY C (W)(LN REDUCT ARROW) | 30 EA | $400 | $12k |
| 3% |