Signal Maint. FY26
Lamar County · est $659k
Lamar County · est $659k
3 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | NORTH TEXAS TRAFFIC SYSTEMS CONSTRUCTION | $549,355.00 | — |
| 2 | TEXAS TRAFFIC CONTROL SYSTEMS, INC. | $612,049.00 | $62,694.00 |
| 3 | STRIPING TECHNOLOGY, L.P. | $824,038.50 | $274,683.50 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 690-7011 INSTALL OF CABLES | 10,000 LF | $6.5 | $65k | 12% |
| 690-7025 REPLACE OF SIGNAL HEAD ASSM | 50 EA | $1,250 | $63k | 11% |
| 680-7002 INSTALL HWY TRF SIG (ISOLATED) | 4 EA | $12,500 | $50k | 9% |
| 500-7002 MOBILIZATION (CALLOUT) | 12 EA | $3,200 | $38k | 7% |
| 690-7026 INSTALL OF SIGNAL HEAD ASSM | 18 EA | $1,250 | $23k | 4% |
| 6017-7015 VIDEO IMAGING AND RADAR DETECTOR | 4 EA | $5,500 | $22k | 4% |
| 690-7072 INS OF TRF SIG PL FND (36" DRIL SHFT) | 60 LF | $360 | $22k | 4% |
| 690-7004 INSTALL OF CONDUIT BY BORING | 1,000 LF | $21 | $21k | 4% |
| 690-7002 INSTALL OF CONDUIT BY TRENCHING | 2,000 LF | $10 | $20k | 4% |
| 690-7053 INSTALL OF SIGNAL POLE ASSM | 5 EA | $3,500 | $18k |
| 3% |