FY26 Call Out Striping N. Tarrant
Tarrant County · est $1.6M
Tarrant County · est $1.6M
3 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | STRIPE-A-ZONE, LLC | $1,095,877.50 | — |
| 2 | FC TRAFFIC CONTROL, LLC | $1,206,280.00 | $110,402.50 |
| 3 | TRP INFRASTRUCTURE SERVICES, LLC | $1,236,074.50 | $140,197.00 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 666-7145 RE PM TY I (W)6"(SLD)(090MIL)(CALLOUT) | 150,000 LF | $0.58 | $87k | 8% |
| 666-7422 REFL PAV MRK TY I (Y)6"(SLD)(090MIL) | 150,000 LF | $0.58 | $87k | 8% |
| 666-7243 RE PM TY III (W)(12")(DOT) | 95,000 LF | $0.9 | $86k | 8% |
| 666-7236 RE PM TY III (W)(6")(SLD) | 95,000 LF | $0.75 | $71k | 7% |
| 666-7035 REFL PAV MRK TY I (W)24"(SLD)(090MIL) | 4,500 LF | $12.75 | $57k | 5% |
| 666-7237 RE PM TY III (W)(6")(BRK) | 75,000 LF | $0.75 | $56k | 5% |
| 666-7248 RE PM TY III (Y)(6")(SLD) | 75,000 LF | $0.75 | $56k | 5% |
| 666-7144 RE PM TY I (W)6"(BRK)(090MIL)(CALLOUT) | 75,000 LF | $0.62 | $47k | 4% |
| 666-7239 RE PM TY III (W)(8")(SLD) | 50,000 LF | $0.9 | $45k | 4% |
| 666-7419 REFL PAV MRK TY I (Y)6"(BRK)(090MIL) |
| 75,000 LF |
| $0.6 |
| $45k |
| 4% |