US 287; FM 157 to Heritage Pkwy
Tarrant County · est $3.5M
Tarrant County · est $3.5M
7 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | O. TREVINO CONSTRUCTION, LLC | $2,623,266.87 | — |
| 2 | FOUTSCO PAVING COMPANY, LLC | $2,832,085.34 | $208,818.47 |
| 3 | SELECT MAINTENANCE, L.L.C. | $3,120,766.79 | $497,499.92 |
| 4 | DIAMOND SURFACE, INC. | $3,858,768.13 | $1,235,501.26 |
| 5 | EMERY SAPP & SON'S INC. | $4,227,481.90 | $1,604,215.03 |
| 6 | ED BELL CONSTRUCTION COMPANY | $4,718,537.75 | $2,095,270.88 |
| 7 | CDM HOLDINGS | $5,400,452.91 | $2,777,186.04 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
Source check time unavailable
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 361-7003 FULL - DEPTH REPAIR CRCP (8") | 1,301.3 CY | $862 | $1.12M | 43% |
| 3017-7001 CONTINUOUS GRINDING-CONCRETE PAVEMENT | 106,444 SY | $4.65 | $495k | 19% |
| 3017-7005 CONTINUOUS GROOVING-CONCRETE PAVEMENT | 96,656 SY | $3.09 | $299k | 11% |
| 500-7001 MOBILIZATION | 1 LS | $200,000 | $200k | 8% |
| 354-7002 PLANE & TEXT ASPH CONC PAV(0" TO 2") | 9,788 SY | $10.1 | $99k | 4% |
| 428-7001 PENETRATING CONCRETE SURFACE TREATMENT | 9,788 SY | $6.85 | $67k | 3% |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 5 MO | $10,000 | $50k | 2% |
| 505-7003 TMA (MOBILE OPERATION) | 101 DAY | $490 | $49k | 2% |
| 662-7064 WK ZN PAV MRK REMOV (W)4"(SLD) | 41,672 LF | $0.92 | $38k | 1% |
| 662-7097 WK ZN PAV MRK REMOV (Y)4"(SLD) |
| 39,246 LF |
| $0.92 |
| $36k |
| 1% |