BPM - FY 2027
Mclennan County · est $1.2M
Mclennan County · est $1.2M
11 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | TAYLOR BRIDGE LLC | $922,471.00 | — |
| 2 | THE TRUESDELL CORPORATION | $929,929.00 | $7,458.00 |
| 3 | DIGG COMMERCIAL, LLC | $1,084,000.00 | $161,529.00 |
| 4 | ICOS MANAGEMENT, LLC | $1,102,170.25 | $179,699.25 |
| 5 | GARRET SHIELDS INFRASTRUCTURE | $1,177,250.00 | $254,779.00 |
| 6 | CROSS PLUS CONSTRUCTION, LLC | $1,413,933.00 | $491,462.00 |
| 7 | STRUCTURAL INTEGRITY GROUP LLC | $1,489,012.50 | $566,541.50 |
| 8 | BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC | $1,508,855.00 | $586,384.00 |
| 9 | BLACKSMITH VENTURES LLC | $1,693,160.00 | $770,689.00 |
| 10 | REAR CONTRACTORS LLC | $1,805,275.00 | $882,804.00 |
| 11 | CRACKSEAL OF TEXAS, LLC | $2,966,716.00 | $2,044,245.00 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 432-7043 RIPRAP (STONE PROTECTION)(18 IN) | 1,280 CY | $155 | $198k | 22% |
| 429-7007 CONC STR REPAIR (VERTICAL & OVERHEAD) | 327 SF | $300 | $98k | 11% |
| 432-7041 RIPRAP (STONE PROTECTION)(12 IN) | 620 CY | $155 | $96k | 10% |
| 438-7007 CLEANING AND SEALING EXIST JOINTS (CL7) | 1,712 LF | $50 | $86k | 9% |
| 459-7001 GABIONS (GALV) | 184 CY | $350 | $64k | 7% |
| 500-7001 MOBILIZATION | 1 LS | $54,000 | $54k | 6% |
| 432-7045 RIPRAP (STONE PROTECTION)(24 IN) | 339 CY | $155 | $53k | 6% |
| 401-7001 FLOWABLE BACKFILL | 94 CY | $475 | $45k | 5% |
| 132-7015 EMBANK (VEH)(OC)(TY B) | 1,695 CY | $25 | $42k | 5% |
| 429-7009 CONC STR REPAIR (STANDARD) | 150 SF | $150 | $23k | 2% |