6503-20-001 BPM (Structural/Erosion)
Hidalgo County · est $582k
Hidalgo County · est $582k
5 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | DIGG COMMERCIAL, LLC | $566,460.60 | — |
| 2 | ICOS MANAGEMENT, LLC | $680,894.50 | $114,433.90 |
| 3 | GHB EQUIPMENT COMPANY, L.L.C. | $842,250.00 | $275,789.40 |
| 4 | RHINO EQUITY, LLC | $889,870.00 | $323,409.40 |
| 5 | REAR CONTRACTORS LLC | $1,322,070.00 | $755,609.40 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 432-7043 RIPRAP (STONE PROTECTION)(18 IN) | 995 CY | $177 | $176k | 31% |
| 429-7007 CONC STR REPAIR (VERTICAL & OVERHEAD) | 625 SF | $150 | $94k | 17% |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 6 MO | $9,000 | $54k | 10% |
| 432-7041 RIPRAP (STONE PROTECTION)(12 IN) | 226 CY | $210 | $47k | 8% |
| 438-7001 CLEANING AND SEALING EXISTING JOINTS | 2,129 LF | $20 | $43k | 8% |
| 500-7001 MOBILIZATION | 1 LS | $40,000 | $40k | 7% |
| 400-7010 CEM STABIL BKFL | 165 CY | $150 | $25k | 4% |
| 432-7002 RIPRAP (CONC)(5 IN) | 29 CY | $646 | $19k | 3% |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 2 EA | $7,793 | $16k | 3% |
| 735-7060 DRIFTWOOD REMOVAL | 135 CY | $71 | $10k | 2% |