6504-67-001 Full Depth Concrete
Harris County · est $3.0M
Harris County · est $3.0M
4 published bidders
| Rank | Contractor | Published bid | Gap to low bid |
|---|---|---|---|
| 1Low bid | ISI CONTRACTING, INC. | $2,731,500.00 | — |
| 2 | MC2 CIVIL, LLC | $2,774,400.00 | $42,900.00 |
| 3 | STRUCTURAL INTEGRITY GROUP LLC | $3,332,474.00 | $600,974.00 |
| 4 | DIGG COMMERCIAL, LLC | $3,456,150.00 | $724,650.00 |
Source: TxDOT published bid tab. Low bid is the source-published position; it does not establish an agency award.
Review bid results in Workspace →Workspace access is required. The $199 project briefing is a separate purchase.
TxDOT source checked
No addenda matched in the stored source. Check TxDOT for current revisions before bidding.
Stored revisions can change. Confirm the current proposal and all applicable addenda with TxDOT.
How to read this. Bid amounts and plan requests are published TxDOT facts. Low bid describes a published position; it does not establish an agency award. Contractor links require an exact, unique match to the official vendor directory. Confirm current proposal revisions with TxDOT before bidding. More on what Cassandri does →
Bid tab · TxDOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 505-7001 TMA (STATIONARY) | 300 DAY | $3,650 | $1.09M | 40% |
| 361-7060 FULL-DEPTH REPAIR CRCP (12") | 1,500 SY | $338 | $507k | 19% |
| 361-7070 FULL - DEPTH REPAIR CRCP (13"-15") | 1,000 SY | $368 | $368k | 13% |
| 429-7004 CONC STR REPAIR(RAPID DECK REP(PRT DPT) | 7,000 SF | $36 | $252k | 9% |
| 361-7057 FULL - DEPTH REPAIR CRCP (10") | 500 SY | $317 | $159k | 6% |
| 361-7067 FULL - DEPTH REPAIR CRCP (14") | 200 SY | $366 | $73k | 3% |
| 438-7007 CLEANING AND SEALING EXIST JOINTS (CL7) | 7,000 LF | $9 | $63k | 2% |
| 361-7068 FULL-DEPTH REP(BR APPR SLAB)(9"-13") | 150 SY | $380 | $57k | 2% |
| 785-7011 BRIDGE JOINT REPLACEMENT (SEJ) | 200 LF | $283 | $57k | 2% |
| 429-7007 CONC STR REPAIR (VERTICAL & OVERHEAD) |
| 1,000 SF |
| $30 |
| $30k |
| 1% |