Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
326 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 4 | REPAINT STRUCTURES WITH SPOT REPAIR | JEFFERSON | 2018-06-06 | $10,337,837.88 | $8,319,407.20 |
| Rank 3of 6 | SLOPE FAILURE REPAIR | ELLIS | 2018-06-05 | $3,098,362.90 | $2,877,641.20 |
| Low bidof 2 | INSTALLATION OF CRASH WALLS | FREESTONE | 2018-06-05 | $1,744,338.76 | $1,744,338.76 |
| Rank 3of 7 | CONC DECK REPAIR & CONC STR REPAIR | HARRISON | 2018-05-02 | $2,452,659.35 | $2,087,956.00 |
| Rank 3of 5 | ADDING TURN LANE | TARRANT | 2018-05-02 | $405,412.01 | $354,604.50 |
| Rank 4of 9 | MISCELLANEOUS CONCRETE REPAIR | KAUFMAN | 2018-05-02 | $297,650.00 | $280,600.00 |
| Rank 6of 7 | PEDESTRIAN IMPROVEMENTS | DALLAS | 2018-05-01 | $447,232.32 | $350,140.33 |
| Rank 4of 5 | STRUCTURE REPAIR/REPLACE BRG EXPANSION JOINTS | BEXAR | 2018-04-03 | $5,804,113.00 | $4,831,650.00 |
| Rank 4of 5 | FULL DEPTH CONCRETE PAVEMENT MAIN LANES. | DALLAS | 2018-04-03 | $2,498,216.28 | $2,069,851.67 |
| Rank 4of 8 | BRIDGE REPAIR | DALLAS | 2018-04-03 | $357,248.10 | $249,652.50 |
| Rank 4of 10 | SLOPE FAILURE REPAIR | ROCKWALL | 2018-03-07 | $2,427,722.18 | $2,226,102.00 |
| Low bidof 6 | BRIDGE PREVENTATIVE MAINTENANCE | ROCKWALL | 2018-02-01 | $525,013.00 | $525,013.00 |
| Low bidof 8 | DECK AND CONCRETE STRUCTURE REPAIR | WILBARGER | 2017-12-05 | $1,842,668.48 | $1,842,668.48 |
| Low bidof 3 | REPAIR/REPLACE CONCRETE BARRIER | DALLAS | 2017-12-05 | $490,535.00 | $490,535.00 |
| Rank 4of 9 | BRIDGE REPAIRS | CALDWELL | 2017-11-14 | $348,921.00 | $251,000.00 |
| Rank 3of 8 | TRUSS CLEANING AND PAINTING | BELL | 2017-11-03 | $1,686,610.56 | $1,599,937.89 |
| Rank 7of 9 | BRIDGE REHAB | LEE | 2017-11-02 | $1,109,369.78 | $844,010.32 |
| Rank 3of 3 | LANDING 4 TOWER AND GRATING REPAIR | GALVESTON | 2017-11-02 | $461,000.00 | $326,400.00 |
| Low bidof 1 | VARIOUS BRIDGE REPAIRS | HARTLEY | 2017-10-25 | $273,466.00 | $273,466.00 |
| Rank 3of 4 | GR, BS, DR, STR, PAV | TARRANT | 2017-10-04 | $2,096,384.30 | $1,869,823.09 |
| Rank 2of 6 | BRIDGE REHAB & EROSION REPAIR | LLANO | 2017-10-04 | $1,005,842.00 | $890,245.00 |
| Rank 2of 4 | FULL DEPTH CONCRETE REPAIR | DALLAS | 2017-10-04 | $852,194.00 | $805,282.00 |
| Rank 3of 5 | FULL DEPTH CONCRETE REPAIR | DALLAS | 2017-10-03 | $782,700.00 | $693,600.00 |
| Rank 2of 4 | FULL DEPTH CONCRETE REPAIR | DALLAS | 2017-10-03 | $666,184.00 | $606,895.00 |
| Rank 4of 4 | STRUCTURE REPAIR/REPLACE BRG EXPANSION JOINTS | BEXAR | 2017-09-07 | $5,879,680.00 | $3,550,840.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.