Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
326 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 3of 6 | FULL DEPTH CONCRETE REPAIR | DALLAS | 2017-09-07 | $780,663.16 | $690,606.75 |
| Rank 3of 8 | SAFETY TREAT FIXED OBJECTS | TARRANT | 2017-08-09 | $333,272.59 | $281,936.15 |
| Rank 2of 7 | CLEAN/PAINT STEEL GRDRS,REPL BR RAIL,CONC DK OVLY | ANDERSON | 2017-08-08 | $1,689,423.00 | $1,646,254.33 |
| Rank 3of 4 | GR, DR AND PAVEMENT | TARRANT | 2017-08-08 | $4,408,800.53 | $3,732,867.33 |
| Rank 4of 4 | BRIDGE DECK REPLACEMENT | BRAZORIA | 2017-08-08 | $2,854,317.39 | $2,037,263.05 |
| Low bidof 6 | TRANSPARENT NOISE WALL | DALLAS | 2017-08-08 | $1,109,507.00 | $1,109,507.00 |
| Rank 2of 4 | REHABILITATE EXISTING BRIDGE | LAVACA | 2017-07-12 | $1,035,282.80 | $733,626.26 |
| Rank 4of 4 | REPAIR/REPLACE CONCRETE BARRIER | COLLIN | 2017-07-12 | $510,261.46 | $382,036.46 |
| Low bidof 5 | STRUCTURAL BRIDGE REPAIR | TARRANT | 2017-07-12 | $547,186.00 | $547,186.00 |
| Low bidof 4 | REHAB BRIDGE | STEPHENS | 2017-07-11 | $3,484,144.57 | $3,484,144.57 |
| Low bidof 1 | BRIDGE REPAIR | MARTIN | 2017-07-11 | $1,987,502.23 | $1,987,502.23 |
| Rank 5of 7 | PVT REPAIR, SLOT STITCH | KAUFMAN | 2017-06-07 | $1,470,715.00 | $1,088,533.00 |
| Rank 2of 4 | REMOVE EXIST PVMNT,REPLC WITH CONC | TAYLOR | 2017-06-06 | $2,431,879.30 | $2,346,055.50 |
| Rank 4of 7 | PAVEMENT REPAIR & PAVEMENT MARKINGS | ROCKWALL | 2017-05-02 | $2,727,083.57 | $2,315,893.57 |
| Rank 3of 5 | FULL DEPTH CONCRETE REPAIR | NAVARRO | 2017-04-11 | $256,955.00 | $185,050.00 |
| Low bidof 4 | CONC BR RAIL, MBGF, CONC STR RPR | GREGG | 2017-04-04 | $3,114,797.79 | $3,114,797.79 |
| Rank 2of 6 | FULL DEPTH CONCRETE REPAIR | COLLIN | 2017-03-07 | $661,676.50 | $657,809.00 |
| Rank 4of 4 | REPLACE BRIDGE AND APPROACHES | ORANGE | 2017-02-03 | $14,169,276.30 | $11,399,710.80 |
| Rank 2of 4 | HIGH FRICTION SURFACE TREATMENT | BRAZOS | 2017-02-02 | $102,084.00 | $65,138.90 |
| Rank 5of 9 | MILL,CONC,REPAIR,OVERLAY | DALLAS | 2017-02-02 | $1,843,234.54 | $1,511,372.54 |
| Rank 3of 4 | HIGH FRIC SURF TRTMNT | BELL | 2017-02-02 | $185,619.90 | $115,598.20 |
| Rank 2of 5 | BRIDGE REPAIR | DALLAS | 2017-01-04 | $299,710.00 | $259,824.00 |
| Low bidof 2 | BRIDGE PREVENTATIVE MAINTENANCE | DALLAS | 2016-12-01 | $548,901.00 | $548,901.00 |
| Rank 2of 4 | MISCELLANEOUS CONCRETE REPAIR | DALLAS | 2016-11-08 | $249,220.00 | $248,800.00 |
| Rank 2of 4 | MISCELLANEOUS CONCRETE REPAIR | DALLAS | 2016-11-08 | $269,650.00 | $253,810.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.