Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
326 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 4 | BRIDGE PREVENTATIVE MAINTENANCE | DENTON | 2021-07-29 | $132,580.00 | $122,653.00 |
| Rank 7of 7 | FULL DEPTH CONCRETE REPAIR | GRAYSON | 2021-07-02 | $979,268.00 | $675,350.00 |
| Rank 5of 7 | FULL DEPTH CONCRETE REPAIR | COLLIN | 2021-07-01 | $398,410.00 | $290,220.00 |
| Rank 5of 6 | FULL DEPTH CONCRETE REPAIR | HOPKINS | 2021-07-01 | $1,684,905.00 | $1,238,768.00 |
| Rank 2of 5 | REPLACE BEARING SEAT PADS | UVALDE | 2021-06-16 | $100,120.00 | $76,800.00 |
| Low bidof 2 | REPLACE DAMAGED BRIDGE GIRDERS | MEDINA | 2021-06-09 | $1,183,845.22 | $1,183,845.22 |
| Rank 9of 10 | RECONFIGURE INTERSECTION WITH SIDEWALK IMPROVEMENT | DALLAS | 2021-05-06 | $7,687,671.56 | $6,336,366.88 |
| Rank 3of 3 | BRIDGE MAINTENANCE | SWISHER | 2021-05-06 | $5,708,245.19 | $3,742,465.57 |
| Rank 3of 4 | REPAIR ROADWAY | COLLIN | 2021-05-06 | $2,214,545.00 | $1,821,513.00 |
| Rank 7of 10 | BRIDGE MAINTENANCE | SMITH | 2021-05-06 | $422,180.00 | $332,397.00 |
| Rank 3of 3 | REPLACE BEARING PADS,TRAFFIC RAIL AND MB | GALVESTON | 2021-05-06 | $910,163.14 | $555,294.00 |
| Rank 7of 8 | BRIDGE PREVENTIVE MAINTENANCE | LUBBOCK | 2021-05-06 | $1,219,848.00 | $772,300.00 |
| Rank 5of 7 | REPAIR/REPLACE CONCRETE BARRIER | DALLAS | 2021-05-05 | $1,198,960.00 | $1,118,400.00 |
| Low bidof 11 | BRIDGE MAINTENANCE | FREESTONE | 2021-04-07 | $926,052.04 | $926,052.04 |
| Rank 4of 6 | CONCRETE PAVEMENT | JONES | 2021-04-07 | $393,471.54 | $251,560.40 |
| Rank 6of 7 | BRIDGE REPAIR | HENDERSON | 2021-03-16 | $101,939.00 | $49,650.00 |
| Rank 5of 6 | BRIDGE STEEL PILE REPAIR | ERATH | 2021-02-10 | $95,071.00 | $48,115.59 |
| Rank 5of 5 | TRAFFIC SIGNAL IMPROVEMENTS | DALLAS | 2021-02-05 | $2,648,242.15 | $1,886,400.00 |
| Rank 8of 8 | RESURFACE ROADWAY | TARRANT | 2021-02-04 | $1,646,234.31 | $1,193,706.58 |
| Rank 2of 8 | FULL DEPTH CONCRETE REPAIR | ROCKWALL | 2021-02-04 | $799,950.00 | $737,950.00 |
| Low bidof 4 | REHABILITATION OF A BRIDGE FACILITY | MAVERICK | 2020-12-16 | $161,400.00 | $161,400.00 |
| Rank 5of 8 | PREVENTIVE MAINTENANCE | GRAYSON | 2020-12-02 | $1,635,667.00 | $1,248,625.00 |
| Rank 5of 9 | MISCELLANEOUS CONCRETE REPAIR | DALLAS | 2020-12-02 | $447,915.00 | $404,070.00 |
| Rank 4of 9 | MISCELLANEOUS CONCRETE REPAIR | DALLAS | 2020-12-02 | $457,635.00 | $398,600.00 |
| Rank 6of 7 | REPAIR OF EXISTING BRIDGE BEAM | PALO PINTO | 2020-11-19 | $67,590.00 | $41,824.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.