Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
326 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 5 | INSTALL TRAFFIC SIGNAL | TARRANT | 2020-11-05 | $977,160.11 | $741,662.80 |
| Rank 3of 6 | FY 2021 BPM PROJECT | MOORE | 2020-11-05 | $699,307.60 | $666,089.66 |
| Rank 3of 7 | MISCELLANEOUS CONCRETE REPAIR | KAUFMAN | 2020-10-23 | $202,790.00 | $190,350.00 |
| Rank 2of 5 | REPAIR/REPLACE CONCRETE BARRIER | KAUFMAN | 2020-10-08 | $236,800.00 | $229,545.00 |
| Rank 8of 8 | ARMOR JOINT REPAIR SL8 OVER HARDY TLL RD | HARRIS | 2020-10-01 | $2,395,789.70 | $845,014.00 |
| Low bidof 2 | BRIDGE REPAIR | OLDHAM | 2020-09-25 | $68,920.00 | $68,920.00 |
| Rank 3of 4 | CONCRETE STRUCTURE REPAIR | HENDERSON | 2020-09-08 | $445,300.00 | $254,900.00 |
| Rank 4of 4 | FULL DEPTH CONCRETE REPAIR | DALLAS | 2020-09-03 | $3,257,620.00 | $2,783,360.00 |
| Low bidof 7 | BRIDGE PREVENTATIVE MAINTENANCE | TARRANT | 2020-09-03 | $275,544.00 | $275,544.00 |
| Rank 4of 5 | SAFETY TREAT FIXED OBJECTS | GUADALUPE | 2020-07-09 | $3,996,574.98 | $3,093,093.00 |
| Rank 3of 3 | FULL DEPTH CONCRETE REPAIR | DALLAS | 2020-07-09 | $4,545,440.00 | $3,968,790.00 |
| Low bidof 6 | BRIDGE MAINTENANCE | TARRANT | 2020-07-08 | $2,609,024.16 | $2,609,024.16 |
| Rank 6of 9 | CONSTRUCTION OF HAZARD ELIMINATION & SAFETY ON ML | DALLAS | 2020-07-08 | $3,234,655.20 | $2,753,152.00 |
| Low bidof 4 | BRIDGE MAINTENANCE AND REPAIR | POTTER | 2020-05-08 | $15,820,658.82 | $15,820,658.82 |
| Low bidof 3 | CONCRETE FULL DEPTH REPAIR, OV & PVMT MRKGS | DALLAS | 2020-05-07 | $4,268,178.36 | $4,268,178.36 |
| Rank 4of 5 | FULL DEPTH CONCRETE REPAIR | COLLIN | 2020-04-14 | $337,485.00 | $224,979.96 |
| Rank 2of 6 | FOR THE CONSTRUCTION OF BRIDGE DECK REPAIR | DALLAS | 2020-04-09 | $4,498,630.74 | $4,328,705.98 |
| Low bidof 2 | OPERATIONAL IMPROVEMENTS | TRAVIS | 2020-04-08 | $5,815,911.23 | $5,815,911.23 |
| Rank 3of 4 | REHABILITATE BRIDGE | BASTROP | 2020-04-08 | $1,176,785.53 | $863,707.80 |
| Low bidof 9 | BPM-CONCRETE BEAM AND STRUCTURE REPAIR | HOPKINS | 2020-03-19 | $182,140.00 | $182,140.00 |
| Low bidof 5 | REPAIR STEEL BRIDGE MEMBERS | HARRIS | 2020-03-13 | $174,426.00 | $174,426.00 |
| Rank 2of 4 | BRIDGE DECK,BENT,& JOINT REPAIR | STONEWALL | 2020-01-16 | $301,510.00 | $270,200.00 |
| Rank 2of 8 | FY 2020 BPM PROJECT | POTTER | 2020-01-10 | $746,456.78 | $660,194.32 |
| Rank 4of 5 | FULL DEPTH CONCRETE REPAIR | ROCKWALL | 2020-01-09 | $1,117,000.00 | $971,300.00 |
| Rank 3of 4 | BPM | SMITH | 2019-12-10 | $422,300.00 | $221,840.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.