Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
346 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 3 | CONCRETE FULL DEPTH REPAIR, OV & PVMT MRKGS | DALLAS | 2020-05-07 | $4,382,163.05 | $4,268,178.36 |
| Low bidof 5 | FULL DEPTH CONCRETE REPAIR | ELLIS | 2020-05-07 | $1,024,454.95 | $1,024,454.95 |
| Low bidof 5 | FULL DEPTH CONCRETE REPAIR | COLLIN | 2020-04-14 | $224,979.96 | $224,979.96 |
| Rank 2of 4 | FULL DEPTH CONCRETE REPAR | NAVARRO | 2020-04-09 | $1,188,918.25 | $1,129,501.00 |
| Rank 3of 6 | NON-SITE SPEC SPALL & FULL DEPTH REPAIR | MCLENNAN | 2020-04-09 | $274,875.00 | $221,600.00 |
| Rank 13of 13 | BICYCLE AND PEDESTRIAN IMPROVEMENTS | PARKER | 2020-03-04 | $1,103,081.00 | $772,789.00 |
| Rank 2of 9 | FULL DEPTH CONCRETE REPAIRS AND PAVEMENT MARKINGS | DENTON | 2020-03-04 | $1,075,604.25 | $997,920.80 |
| Rank 2of 2 | CALLOUT CONCRETE PAVEMENT REPAIR | BOWIE | 2020-03-04 | $6,106,240.00 | $5,399,700.00 |
| Rank 2of 5 | FULL DEPTH CONCRETE REPAIR | HOPKINS | 2020-02-07 | $1,874,198.00 | $1,777,711.00 |
| Rank 2of 2 | ON-CALL CONCRETE AND PAVEMENT REPAIR | WICHITA | 2020-02-06 | $901,850.00 | $839,711.00 |
| Low bidof 5 | FULL DEPTH CONCRETE REPAIR | ROCKWALL | 2020-01-09 | $971,300.00 | $971,300.00 |
| Rank 3of 4 | FULL DEPTH CONCRETE REPAIR | DENTON | 2019-12-03 | $1,508,597.34 | $695,630.20 |
| Rank 10of 15 | BRIDGE REPAIRS | CROCKETT | 2019-11-15 | $306,290.00 | $141,454.89 |
| Rank 12of 13 | BRIDGE REPAIRS | RUNNELS | 2019-11-15 | $233,420.00 | $95,000.00 |
| Rank 12of 12 | BRIDGE REPAIRS | IRION | 2019-11-15 | $315,222.95 | $99,000.00 |
| Rank 8of 12 | BRIDGE REPAIRS | CONCHO | 2019-11-15 | $304,600.00 | $157,962.00 |
| Rank 2of 8 | REPAIRING BRIDGE JOINTS AND STRIPING | ECTOR | 2019-10-03 | $977,756.00 | $951,628.00 |
| Rank 5of 6 | FULL DEPTH CONCRETE REPAIR | DENTON | 2019-10-02 | $2,254,655.30 | $1,486,329.30 |
| Low bidof 3 | REHABILITATE EXISTING ROADWAY | TARRANT | 2019-08-07 | $3,677,405.00 | $3,677,405.00 |
| Rank 2of 2 | RESURFACE ROADWAY | TARRANT | 2019-08-06 | $1,435,131.50 | $1,029,420.60 |
| Rank 2of 2 | REHABILITATE EXISTING ROADWAY | LUBBOCK | 2019-06-05 | $1,563,576.20 | $1,274,328.50 |
| Low bidof 5 | MILL, FDR AND ACP OVERLAY ON FRONTAGE ROADS | DALLAS | 2019-06-05 | $3,063,097.80 | $3,063,097.80 |
| Low bidof 6 | FULL DEPTH CONCRETE REPAIR | COLLIN | 2019-03-05 | $1,923,008.00 | $1,923,008.00 |
| Rank 2of 2 | GR, BS, DR, PAV | PARKER | 2019-01-09 | $5,165,530.70 | $3,434,712.21 |
| Low bidof 4 | FULL DEPTH REPAIR CP, OVERLAY & PAVEMENT MARKINGS | DALLAS | 2019-01-09 | $2,756,288.75 | $2,756,288.75 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.