Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
346 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 7of 15 | 2021 BRIDGE PREVENTATIVE MAINTENANCE | COTTLE | 2020-12-03 | $485,879.20 | $359,682.00 |
| Low bidof 8 | PREVENTIVE MAINTENANCE | GRAYSON | 2020-12-02 | $1,248,625.00 | $1,248,625.00 |
| Rank 6of 9 | MISCELLANEOUS CONCRETE REPAIR | DALLAS | 2020-12-02 | $450,872.75 | $404,070.00 |
| Rank 6of 9 | MISCELLANEOUS CONCRETE REPAIR | DALLAS | 2020-12-02 | $461,950.00 | $398,600.00 |
| Rank 3of 14 | BRIDGE JOINT REPAIR | ECTOR | 2020-11-05 | $230,832.00 | $173,811.00 |
| Rank 5of 5 | REPAIR/REPLACE CONCRETE BARRIER | KAUFMAN | 2020-10-08 | $356,000.00 | $229,545.00 |
| Rank 8of 10 | RAMP MODIFICATIONS | DALLAS | 2020-10-02 | $2,647,017.44 | $2,146,127.93 |
| Rank 8of 9 | REPLACE GUARDRAIL | TARRANT | 2020-10-02 | $2,696,443.26 | $1,967,260.90 |
| Rank 2of 5 | SURFACING/ROADWAY RESTORATION | GRAY | 2020-10-01 | $2,860,812.20 | $2,747,710.99 |
| Low bidof 7 | FULL DEPTH CONCRETE REPAIRS AND PAVEMENT MARKINGS | DENTON | 2020-10-01 | $1,113,467.90 | $1,113,467.90 |
| Rank 6of 7 | GUARD FENCE, SAFETY END TREATMENTS AND REPAIRS | TOM GREEN | 2020-09-04 | $1,947,351.50 | $933,272.77 |
| Rank 2of 4 | FULL DEPTH CONCRETE REPAIR | DALLAS | 2020-09-03 | $3,144,008.00 | $2,783,360.00 |
| Rank 5of 7 | BRIDGE PREVENTATIVE MAINTENANCE | TARRANT | 2020-09-03 | $458,954.00 | $275,544.00 |
| Low bidof 2 | REPAIR ROADWAY | TARRANT | 2020-08-05 | $3,560,475.00 | $3,560,475.00 |
| Rank 2of 4 | RECONSTRUCT EXISTING ROADWAY | TARRANT | 2020-08-05 | $2,953,761.04 | $2,659,187.40 |
| Low bidof 3 | FULL DEPTH CONCRETE REPAIR | DALLAS | 2020-07-09 | $3,968,790.00 | $3,968,790.00 |
| Rank 5of 9 | BRIDGE PREVENTIVE MAINTENANCE | WICHITA | 2020-07-09 | $1,224,970.00 | $903,670.00 |
| Low bidof 4 | FULL DEPTH CONCRETE REPAIR | GRAYSON | 2020-07-09 | $683,911.25 | $683,911.25 |
| Rank 3of 9 | CONSTRUCTION OF HAZARD ELIMINATION & SAFETY ON ML | DALLAS | 2020-07-08 | $2,913,562.60 | $2,753,152.00 |
| Rank 3of 9 | CONSTRUCT RAMPS | TARRANT | 2020-07-08 | $1,811,700.38 | $1,779,729.96 |
| Rank 4of 4 | BRIDGE REPLACEMENT | HALE | 2020-07-08 | $657,904.00 | $436,230.00 |
| Low bidof 4 | SITE SPECIFIC FULL DEPTH CONCRETE REPAIR | HOPKINS | 2020-07-08 | $1,413,270.10 | $1,413,270.10 |
| Rank 3of 4 | FULL DEPTH CONCRETE REPAIR | NAVARRO | 2020-06-09 | $168,890.00 | $134,950.00 |
| Low bidof 4 | FULL DEPTH CONCRETE REPAIRS | COLLIN | 2020-05-08 | $2,150,063.50 | $2,150,063.50 |
| Low bidof 6 | RESURFACE ROADWAY | TARRANT | 2020-05-07 | $3,195,838.30 | $3,195,838.30 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.