Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
346 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 6 | HIGHWAY IMPROVEMENT | MOORE | 2021-07-02 | $4,709,409.74 | $4,229,617.35 |
| Rank 4of 7 | FULL DEPTH CONCRETE REPAIR | GRAYSON | 2021-07-02 | $841,115.00 | $675,350.00 |
| Rank 7of 7 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | MCLENNAN | 2021-07-01 | $2,681,881.40 | $1,886,100.89 |
| Rank 3of 7 | FULL DEPTH CONCRETE REPAIR | COLLIN | 2021-07-01 | $316,499.50 | $290,220.00 |
| Rank 4of 6 | FULL DEPTH CONCRETE REPAIR | HOPKINS | 2021-07-01 | $1,602,945.80 | $1,238,768.00 |
| Rank 2of 4 | CONSTRUCT RAMPS | LUBBOCK | 2021-06-04 | $4,837,441.05 | $4,034,018.84 |
| Rank 9of 11 | BICYCLE AND PEDESTRIAN IMPROVEMENTS | DALLAS | 2021-06-03 | $2,647,362.90 | $1,924,541.55 |
| Rank 5of 8 | BRIDGE REPLACEMENT | COLLINGSWORTH | 2021-06-03 | $1,414,256.75 | $954,519.00 |
| Rank 4of 6 | CULVERT REPAIR PROGRAM (2021) | ECTOR | 2021-06-03 | $555,500.00 | $334,501.00 |
| Low bidof 4 | REPAIR ROADWAY | COLLIN | 2021-05-06 | $1,821,513.00 | $1,821,513.00 |
| Rank 2of 3 | INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT T | LAMPASAS | 2021-05-06 | $514,194.35 | $387,266.75 |
| Rank 6of 6 | CONSTRUCT SIDEWALKS AND CURB RAMPS | HARRISON | 2021-05-06 | $1,092,025.70 | $477,174.00 |
| Rank 2of 3 | FULL DEPTH CONCRETE REPAIR | POTTER | 2021-05-06 | $1,164,550.00 | $1,074,720.00 |
| Rank 10of 11 | BRIDGE REPAIR | ECTOR | 2021-05-06 | $519,099.20 | $388,307.00 |
| Rank 5of 11 | HAZARD ELIMINATION & SAFETY | ECTOR | 2021-05-05 | $4,595,097.55 | $3,694,500.20 |
| Rank 5of 6 | INSTALL TRAFFIC SIGNAL | WISE | 2021-04-08 | $3,052,897.20 | $2,749,994.21 |
| Rank 3of 4 | FULL DEPTH CONCRETE REPAIR | MCLENNAN | 2021-04-08 | $156,582.00 | $136,233.00 |
| Low bidof 6 | CONCRETE PAVEMENT | JONES | 2021-04-07 | $251,560.40 | $251,560.40 |
| Rank 2of 2 | ON CALL CONCRETE PUNCHOUTS | VICTORIA | 2021-03-04 | $1,424,350.00 | $979,700.00 |
| Rank 11of 13 | CROSS DRAIN STRUCTURES REPAIR OR REPLACEMENT | COLLIN | 2021-02-05 | $370,825.13 | $197,225.00 |
| Rank 6of 10 | CABLE BARRIER INSTALLATION | DENTON | 2021-02-04 | $1,896,783.35 | $1,626,066.95 |
| Rank 3of 8 | RESURFACE ROADWAY | TARRANT | 2021-02-04 | $1,282,006.47 | $1,193,706.58 |
| Rank 9of 14 | MISCELLANEOUS BRIDGE REPAIR | HOWARD | 2021-02-04 | $618,068.00 | $425,867.00 |
| Low bidof 8 | FULL DEPTH CONCRETE REPAIR | ROCKWALL | 2021-02-04 | $737,950.00 | $737,950.00 |
| Rank 6of 12 | BRIDGE JOINT REPAIR PROGRAM (2021) | ECTOR | 2021-01-07 | $1,497,679.90 | $1,267,114.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.