Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
130 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 7of 9 | Districtwide Sidewalk FY 2025 | BROWN | 2025-07-01 | $1,595,212.31 | $1,364,489.16 |
| Rank 3of 12 | BS19 (S. Palestine ST) PED Improve Seg 1 | HENDERSON | 2025-06-05 | $1,842,869.32 | $1,484,624.46 |
| Rank 8of 10 | FM 2818 near Welsh - SUP | BRAZOS | 2025-06-05 | $2,048,057.60 | $1,789,919.35 |
| Low bidof 6 | Jackson St. Safe Routes Sidewalk Project | WHARTON | 2025-06-05 | $2,130,273.30 | $2,130,273.30 |
| Rank 8of 8 | BPM FY 2026 | POTTER | 2025-06-05 | $1,721,384.92 | $1,052,829.50 |
| Rank 2of 7 | FM 908 at US 79 in Rockdale 1 - PED FY25 | MILAM | 2025-06-04 | $730,136.27 | $714,788.50 |
| Rank 4of 6 | ADA_REMEDIATION | ECTOR | 2025-06-04 | $1,495,468.96 | $1,271,684.30 |
| Rank 2of 7 | FM 2790: 1741-01-013 | ATASCOSA | 2025-06-04 | $1,724,746.45 | $1,236,296.25 |
| Rank 2of 6 | SAFETY_MIDLAND_TEXAS_AVE_A_ST_C_ST | MIDLAND | 2025-05-02 | $1,482,631.91 | $1,295,425.35 |
| Rank 4of 6 | SH 136 Ped Improvement - Fritch | HUTCHINSON | 2025-05-02 | $3,794,048.81 | $3,406,939.22 |
| Low bidof 9 | BMIP SL 322 NB AT UPRR TAYLOR CO | TAYLOR | 2025-05-01 | $1,338,126.80 | $1,338,126.80 |
| Low bidof 6 | ADA | SL396 | US 84 to Bagby Ave | MCLENNAN | 2025-05-01 | $2,695,683.72 | $2,695,683.72 |
| Rank 3of 4 | BS 6-R F:N of SH 21. T:FM 158 - Interim | BRAZOS | 2025-05-01 | $5,287,972.96 | $4,454,972.58 |
| Rank 5of 6 | 003806051 US 83 STARR (Roma Sidewalks) | STARR | 2025-04-04 | $1,921,151.32 | $1,458,980.10 |
| Low bidof 5 | US 287 NB/FM 281 & RR BRG FY 25 BMIP | MOORE | 2025-04-04 | $3,547,551.90 | $3,547,551.90 |
| Low bidof 1 | SH 152 Ped Improvement - Dumas | MOORE | 2025-04-04 | $9,996,584.51 | $9,996,584.51 |
| Rank 3of 6 | DISTRICTWIDE ADA REMEDIATION (VARIOUS) | NUECES | 2025-04-03 | $1,846,162.48 | $1,821,967.00 |
| Rank 2of 6 | IH 410: 0521-04-293; PED | BEXAR | 2025-03-05 | $3,460,983.63 | $2,872,934.12 |
| Rank 5of 5 | FY 25 CRCP on IH 27 | LUBBOCK | 2025-03-05 | $2,889,604.60 | $2,186,698.96 |
| Rank 7of 8 | FY 25 District wide Bridge PM | WICHITA | 2025-02-07 | $5,286,850.00 | $3,651,021.44 |
| Rank 11of 11 | US 82 Sidewalk | RED RIVER | 2025-02-07 | $2,094,316.67 | $1,486,446.00 |
| Rank 5of 7 | BPM FY 2025 | POTTER | 2025-02-06 | $2,222,923.60 | $1,595,496.40 |
| Rank 5of 10 | US 90: 0024-01-113; PED | UVALDE | 2025-02-06 | $2,944,583.84 | $2,879,645.50 |
| Rank 4of 4 | FY 2025 BRIDGE CYCLIC MAINTENANCE | POTTER | 2025-01-08 | $1,455,552.80 | $652,371.94 |
| Rank 6of 6 | FY 2025 Concrete Pavement US 75 | GRAYSON | 2025-01-07 | $1,970,950.00 | $1,472,289.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.