Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
304 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 5of 10 | GR,BS,DR,PAV,STR,ITS,PAV MK, SIGN | TARRANT | 2018-09-07 | $21,593,000.00 | $20,514,949.44 |
| Rank 5of 5 | RECON ML,FR & CONST OVERPASS AT CAMBRIDGE | HARRIS | 2018-09-06 | $147,649,743.63 | $116,922,668.26 |
| Low bidof 5 | PVT,GRDING,STRS,BASE,SIGNING,ITS | AUSTIN | 2018-08-08 | $317,508,658.52 | $317,508,658.52 |
| Rank 4of 7 | EMB, FL BS, STRS, AND ACP | TAYLOR | 2018-08-08 | $35,176,176.00 | $27,993,542.39 |
| Rank 6of 9 | GR, DR, STR, BS AND PAVEMENT | HOOD | 2018-08-07 | $72,116,504.08 | $60,713,830.16 |
| Low bidof 9 | GRADING, STRUCTURES, PAVEMENT & STR | TARRANT | 2018-08-07 | $48,586,586.00 | $48,586,586.00 |
| Low bidof 6 | REPLACE BRIDGE & APPROACHES | HAYS | 2018-08-07 | $31,736,977.23 | $31,736,977.23 |
| Rank 5of 5 | WIDEN FREEWAY FROM 4 TO 6 LANES | JEFFERSON | 2018-07-11 | $168,883,390.02 | $128,399,059.91 |
| Rank 5of 5 | CONSTRUCT RELIEF ROUTE AROUND DRISCOLL | NUECES | 2018-07-11 | $143,075,075.00 | $118,322,898.17 |
| Rank 2of 7 | WIDEN FROM 2 TO 4 LANES DIVIDED ROADWAY | FORT BEND | 2018-07-11 | $19,103,165.40 | $18,950,219.53 |
| Rank 2of 4 | EXPAND TO 6 LN EXPWY WITH FR RD 4 GEN - 2 HOV | BEXAR | 2018-07-10 | $188,494,175.40 | $178,383,491.74 |
| Low bidof 5 | ADD ONE LANE IN EACH DIRECTION | TRAVIS | 2018-06-06 | $69,910,317.29 | $69,910,317.29 |
| Rank 4of 8 | EXPAND FROM 2 LANES TO 4 LANES DIVIDED | BEXAR | 2018-06-06 | $42,723,403.85 | $40,398,632.30 |
| Rank 3of 10 | CONSTRUCT 0/4 LN FRTG RDS AND RAMP MODIFICATIONS | DALLAS | 2018-06-06 | $39,509,900.00 | $37,840,877.84 |
| Rank 3of 6 | GR, STRS, BASE & PAVEMENT | GALVESTON | 2018-06-05 | $245,814,912.33 | $230,477,520.47 |
| Rank 3of 6 | EXPAND FROM 4 LANE DIVIDED TO 4 LANE EXPRESSWAY | BEXAR | 2018-06-05 | $48,551,044.31 | $45,888,888.82 |
| Rank 6of 6 | WIDEN FROM 2 TO 4 LANES WITH CLTL | MONTGOMERY | 2018-06-05 | $16,733,695.71 | $14,962,668.47 |
| Low bidof 5 | WIDEN TO 6 LANES WITH 4 LANE EXPRESS LANES | HARRIS | 2018-05-02 | $201,835,272.64 | $201,835,272.64 |
| Rank 5of 5 | GR, BS, SURF, STRUCTS | NUECES | 2018-05-02 | $46,372,107.46 | $37,950,858.38 |
| Rank 5of 6 | GR STRS BASE & SURF | ANGELINA | 2018-05-02 | $82,980,002.06 | $71,614,966.82 |
| Low bidof 5 | EXPAND FROM 4 TO 6 LANE EXPRESSWAY | BEXAR | 2018-05-01 | $119,776,274.22 | $119,776,274.22 |
| Rank 6of 11 | WIDEN FROM 2 LANES TO 6 LANES URBAN DIVIDED | ELLIS | 2018-05-01 | $33,879,990.00 | $32,207,126.84 |
| Rank 4of 11 | CONSTRUCT_GRADE SEPARATION | MONTGOMERY | 2018-04-03 | $26,217,045.58 | $23,483,270.27 |
| Rank 8of 9 | RECONSTRUCT TO A 4 LANE DIVIDED CURB & GUTTER | MONTGOMERY | 2018-03-07 | $20,397,621.40 | $18,657,275.42 |
| Rank 2of 9 | WIDEN TWO LANE RURAL TO SIX LANE URBAN DIVIDED | DENTON | 2018-03-07 | $18,838,150.00 | $18,011,511.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.