Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
304 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 5of 9 | GRAD, BS, STR, SURF, PVMT MRKG | KENDALL | 2018-03-06 | $70,857,713.92 | $64,660,757.43 |
| Rank 2of 7 | WIDEN & RECONSTRUCT 6 TO 8 LANES | TARRANT | 2018-02-01 | $58,199,899.99 | $53,390,999.88 |
| Rank 5of 12 | ADD ONE LANE IN EACH DIRECTION | TRAVIS | 2017-12-06 | $39,994,689.07 | $36,726,431.19 |
| Rank 2of 5 | CONSTRUCT BUSWAY FACILITY | HARRIS | 2017-12-06 | $57,555,749.03 | $57,190,569.43 |
| Rank 3of 11 | GR,DR,BS,STR,PAV,ITS,SGNL,ILLUM & SGN | TARRANT | 2017-12-05 | $176,580,580.00 | $173,724,094.66 |
| Rank 7of 9 | GR, STRS & SURF | HARRIS | 2017-11-02 | $21,784,654.97 | $18,871,436.31 |
| Rank 4of 11 | WIDEN TO 4-LN & CONSTR RR GR SEPARATION | FORT BEND | 2017-10-04 | $35,798,164.34 | $34,567,384.20 |
| Rank 7of 9 | STR, GR, BASE, ACP, SGNS, PVMT MARKS, UTIL ADJUST | TRAVIS | 2017-08-09 | $136,391,907.93 | $124,206,530.53 |
| Rank 3of 5 | WIDEN FREEWAY (SIX LANES) | WALKER | 2017-08-09 | $126,615,459.18 | $122,051,472.89 |
| Rank 2of 2 | REBUILDING INTERCHANGE OF IH610/IH69 | HARRIS | 2017-08-08 | $310,252,803.30 | $258,760,518.58 |
| Low bidof 9 | GRADE SEPARATION OF MAIN LANES | TRAVIS | 2017-08-08 | $53,513,431.98 | $53,513,431.98 |
| Rank 3of 4 | CONSTRUCT INTERCHANGE,MAINLANES AND FRT ROADS | RANDALL | 2017-07-12 | $51,695,500.00 | $42,375,492.33 |
| Rank 8of 9 | REPLACE SWING BRIDGE | MATAGORDA | 2017-07-12 | $57,990,944.99 | $41,231,130.96 |
| Rank 2of 8 | GRADING, STRUCTURES, BASE AND SURFACE | COMAL | 2017-07-11 | $45,649,738.76 | $42,308,391.45 |
| Rank 5of 5 | FLEX BASE,SURF,BRIDGE AND PAV MRK | WEBB | 2017-07-11 | $29,265,907.65 | $25,596,044.49 |
| Rank 5of 5 | CONST 1 MORE ML EACH DIRECTION AND REPLACE BRIDGES | WALLER | 2017-06-07 | $152,474,810.66 | $141,496,478.10 |
| Low bidof 7 | NEW LOCATION BRIDGE CONSTRUCTION | DALLAS | 2017-06-07 | $39,547,700.00 | $39,547,700.00 |
| Rank 5of 5 | CNST 0 TO 3/4 CD, RCNST 1/3 SBFR, RAMP MOD OP IMP | DALLAS | 2017-06-06 | $133,517,764.98 | $109,686,038.50 |
| Rank 3of 5 | REPLACE BRIDGES,FRT RD IMPROVE,REHAB TRAF SIGNALS | POTTER | 2017-04-05 | $8,065,915.45 | $7,472,229.70 |
| Rank 2of 3 | WIDEN TO 10 MAIN LANES, TWO 3-LANE FRNTG ROADS | HARRIS | 2017-04-04 | $109,438,620.41 | $99,783,476.68 |
| Rank 6of 11 | REALIGN EXISTING ROADWAY | EASTLAND | 2017-03-08 | $84,030,963.38 | $76,238,256.10 |
| Low bidof 7 | GR, STRS, BASE, SIGN, DELIN & PAVE MRKRS | BEXAR | 2017-02-02 | $192,301,342.54 | $192,301,342.54 |
| Rank 2of 7 | GRADE,BASE,ACP,STR,BR | DAWSON | 2017-02-02 | $18,269,500.00 | $17,078,039.55 |
| Low bidof 5 | WIDEN FREEWAY (SIX LANES) | WALKER | 2017-01-04 | $128,204,638.09 | $128,204,638.09 |
| Rank 2of 7 | GR, DRAINAGE, PVMT, STR, SIGNS | ELLIS | 2017-01-04 | $67,714,000.00 | $63,971,599.94 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.