Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
561 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 6of 8 | CONSTRUCT NEW ROADWAY LANES | TARRANT | 2019-10-02 | $25,617,544.02 | $21,436,036.74 |
| Rank 3of 6 | BRIDGE REPLACEMENT | MONTGOMERY | 2019-09-05 | $6,667,393.76 | $6,264,643.82 |
| Rank 2of 7 | CONSTRUCT RAMPS | HARRIS | 2019-09-05 | $4,787,132.74 | $4,637,319.22 |
| Rank 2of 3 | REPLACE BEARING PADS | HARRIS | 2019-06-05 | $683,281.50 | $578,700.00 |
| Low bidof 5 | REPLACE BEARING PADS | HARRIS | 2019-06-05 | $1,045,020.00 | $1,045,020.00 |
| Low bidof 5 | FULL DEPTH CONCRETE REPAIR ON FRONTAGE ROADS | DALLAS | 2019-06-05 | $3,979,913.91 | $3,979,913.91 |
| Rank 2of 4 | SIGS, CHEV, BR RAIL, GRDRL, MRKS | DALLAS | 2019-06-04 | $4,958,540.00 | $4,663,152.50 |
| Rank 3of 6 | REPLACE GUARDRAIL | TARRANT | 2019-06-04 | $4,798,910.25 | $4,081,763.15 |
| Rank 2of 4 | INSTALL MEDIAN CABLE AND CONCRETE BARRIER | KAUFMAN | 2019-06-04 | $4,367,149.55 | $4,110,939.65 |
| Low bidof 3 | REPLACE BEARING PADS | HARRIS | 2019-06-04 | $1,750,062.00 | $1,750,062.00 |
| Rank 4of 5 | REHABILITATION OF EXISTING ROAD | PARKER | 2019-05-08 | $25,048,185.54 | $23,361,070.20 |
| Rank 5of 10 | INSTALL MEDIAN CONCRETE BARRIERS | DENTON | 2019-04-03 | $3,379,759.52 | $3,179,440.56 |
| Rank 12of 12 | REPLACE BRIDGE AND APPROACHES | DENTON | 2019-01-09 | $4,260,673.24 | $3,324,126.28 |
| Low bidof 9 | 9 INTERSECTION IMPROVEMENTS | DALLAS | 2019-01-08 | $8,688,435.08 | $8,688,435.08 |
| Low bidof 6 | REPLACE BRIDGE AND APPROACHES | ORANGE | 2019-01-08 | $3,732,469.40 | $3,732,469.40 |
| Rank 10of 12 | CONSTRUCT SIDEWALKS | HARRIS | 2019-01-08 | $3,574,965.07 | $2,789,052.50 |
| Low bidof 8 | REPLACE BRIDGE AND APPROACHES | DALLAS | 2019-01-08 | $6,192,206.21 | $6,192,206.21 |
| Rank 4of 8 | GRADING,PAVEMENT & TRUCTURES | DALLAS | 2018-12-06 | $14,012,990.89 | $12,584,595.17 |
| Rank 4of 7 | REPL MEDIAN RAIL W/CTB,REPL ILLUM POLE ASSEMBLIES | HARRIS | 2018-11-06 | $2,286,762.48 | $1,819,178.03 |
| Rank 6of 6 | INTERSECTION IMPROVEMENTS | WALLER | 2018-10-03 | $1,693,301.12 | $1,240,388.54 |
| Rank 8of 10 | GR,BS,DR,PAV,STR,ITS,PAV MK, SIGN | TARRANT | 2018-09-07 | $23,994,404.47 | $20,514,949.44 |
| Rank 7of 10 | RIPRAP SLOPE REPAIR | TARRANT | 2018-09-06 | $863,318.00 | $655,000.00 |
| Rank 3of 5 | CONCRETE PAVEMENT REPAIR | TARRANT | 2018-08-08 | $2,112,570.00 | $1,777,800.00 |
| Rank 5of 6 | CONSTRUCT CURB RAMPS | TARRANT | 2018-08-07 | $3,102,578.14 | $2,419,003.00 |
| Rank 8of 11 | REPLACE BRIDGE AND APPROACHES | KAUFMAN | 2018-07-11 | $3,489,761.64 | $2,718,727.83 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.