Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
561 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Low bidof 8 | WIDEN FROM 6 TO 8 LANES | FORT BEND | 2018-06-06 | $6,992,340.39 | $6,992,340.39 |
| Rank 2of 5 | REPLACE BRIDGE AND APPROACHES | JEFFERSON | 2018-06-06 | $15,413,053.21 | $14,655,685.45 |
| Low bidof 5 | BRIDGE DECK REPAIR AND ABUT & BENT WORK | DALLAS | 2018-06-06 | $906,208.75 | $906,208.75 |
| Rank 2of 10 | CONSTRUCT 0/4 LN FRTG RDS AND RAMP MODIFICATIONS | DALLAS | 2018-06-06 | $38,840,612.61 | $37,840,877.84 |
| Rank 6of 10 | REPLACE BRIDGE AND APPROACHES | HARRIS | 2018-06-05 | $8,664,071.30 | $7,552,754.40 |
| Rank 3of 6 | UPGRADE BRIDGE & APPROACH RAILING | TARRANT | 2018-06-05 | $1,593,936.50 | $1,213,542.00 |
| Low bidof 6 | GR, BS, DR, STR, PAV | TARRANT | 2018-06-05 | $1,141,382.10 | $1,141,382.10 |
| Rank 3of 5 | GR, BS, SURF, STRUCTS | NUECES | 2018-05-02 | $40,942,426.07 | $37,950,858.38 |
| Rank 4of 11 | CHANNEL WORK, GRD | DALLAS | 2018-05-02 | $3,276,046.44 | $2,950,293.01 |
| Rank 4of 6 | WIDEN FROM 2 TO 4-LANE DIVIDED W/CURB & GUTTER | HARRIS | 2018-05-02 | $1,866,096.47 | $1,763,846.49 |
| Rank 4of 8 | UPGRADE BRIDGE AND APPROACH RAILING | JEFFERSON | 2018-05-02 | $311,369.70 | $237,658.00 |
| Rank 2of 9 | CONSTRUCT SOUNDWALL | HARRIS | 2018-05-02 | $2,120,187.18 | $2,082,833.99 |
| Rank 3of 3 | CONSTRUCT FRONTAGE ROADS | VICTORIA | 2018-05-01 | $31,925,689.78 | $28,593,622.70 |
| Low bidof 3 | RESTORATION OF FRONTAGE ROADS | HARRIS | 2018-05-01 | $2,119,421.76 | $2,119,421.76 |
| Rank 3of 9 | REPLACE AND RELOCATE BRIDGE | TARRANT | 2018-05-01 | $2,757,961.01 | $2,379,000.00 |
| Rank 3of 6 | CONST DEDICATED TURN LNS & SIGNAL | FORT BEND | 2018-05-01 | $2,767,624.60 | $2,668,897.28 |
| Rank 8of 10 | RECONST & WIDEN 2 LN.RURAL TO 4 LN.DIVIDED,ULT_6 | ROCKWALL | 2018-04-04 | $22,630,610.26 | $20,669,106.22 |
| Rank 4of 6 | CONSTRUCTION OF SHARED USE PATH | HARRIS | 2018-04-04 | $1,987,184.51 | $1,764,011.10 |
| Rank 6of 8 | GR, BASE, ACP OVERLAY, PVMT MKGS | ROCKWALL | 2018-04-04 | $3,448,764.15 | $2,750,739.99 |
| Rank 3of 7 | GRADE SEPARATION, REHAB & EXTEND FRONTAGE ROADS | JEFFERSON | 2018-04-03 | $19,887,186.67 | $18,747,291.34 |
| Rank 3of 5 | FULL DEPTH CONCRETE PAVEMENT MAIN LANES. | DALLAS | 2018-04-03 | $2,493,893.03 | $2,069,851.67 |
| Rank 3of 9 | CONCRETE FULL DEPTH REPAIR | DENTON | 2018-04-03 | $2,482,817.10 | $2,203,011.05 |
| Rank 4of 4 | INTERSECTION IMPROVEMENTS | DENTON | 2018-03-07 | $1,683,148.60 | $1,280,176.58 |
| Rank 2of 4 | FULL DEPTH CONCRETE REPAIR | COLLIN | 2018-03-07 | $1,301,930.00 | $1,230,202.68 |
| Rank 5of 10 | SLOPE FAILURE REPAIR | ROCKWALL | 2018-03-07 | $2,480,511.50 | $2,226,102.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.