Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
608 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 4 | PLANE ACP, ACP SURF, & PAV MARK | UPSHUR | 2018-05-01 | $5,547,068.30 | $5,046,398.12 |
| Rank 9of 10 | DRAINAGE STRUCTURE MAINTENANCE | TITUS | 2018-05-01 | $552,750.75 | $398,912.75 |
| Rank 10of 10 | RECONST & WIDEN 2 LN.RURAL TO 4 LN.DIVIDED,ULT_6 | ROCKWALL | 2018-04-04 | $27,212,671.86 | $20,669,106.22 |
| Rank 2of 8 | HAZARD ELIMINATION & SAFETY | HUNT | 2018-04-04 | $2,180,170.90 | $1,784,029.22 |
| Rank 3of 4 | PAV REPAIR,ACP,MBGF,BR RAIL, PV MRK | PANOLA | 2018-04-04 | $5,077,782.04 | $4,645,909.71 |
| Rank 5of 14 | FLX BS,LVL-UP,OCST,HMAC,STRS,PV MRK | VAN ZANDT | 2018-04-03 | $11,331,648.73 | $9,587,787.65 |
| Rank 8of 10 | REPLACE BRIDGE AND APPROACHES | POLK | 2018-04-03 | $599,596.75 | $480,182.55 |
| Rank 7of 8 | GR,BS,SURF & PAV MRKS | TITUS | 2018-04-03 | $3,777,376.45 | $3,193,652.30 |
| Rank 4of 11 | HAZARD ELIMINATION & SAFETY | RED RIVER | 2018-03-07 | $895,890.80 | $841,028.20 |
| Rank 2of 7 | REPLACE BRIDGE & APPROACHES | SMITH | 2018-03-07 | $2,070,954.23 | $2,029,446.31 |
| Rank 4of 7 | GR, STRS, ACP BS & SURF, C&G | VAN ZANDT | 2018-03-07 | $602,717.00 | $496,651.35 |
| Low bidof 3 | ACP SURFACE & PAV MARKINGS | BOWIE | 2018-03-07 | $1,149,721.78 | $1,149,721.78 |
| Low bidof 3 | TEXTURIZE SHOULDERS & CL TEXTURING | CASS | 2018-03-07 | $3,512,191.16 | $3,512,191.16 |
| Rank 3of 10 | REPLACE BRIDGE & APPROACHES | SMITH | 2018-03-07 | $869,405.25 | $833,389.25 |
| Rank 3of 4 | PLANE, LEVEL-UP AND PFC | SHELBY | 2018-03-06 | $11,269,284.49 | $9,572,121.03 |
| Rank 7of 7 | BRIDGE REPLACEMENT | ANGELINA | 2018-03-06 | $1,285,533.15 | $1,023,277.64 |
| Rank 3of 11 | SAFETY TREAT FIXED OBJECTS | BOWIE | 2018-03-06 | $1,604,778.95 | $1,463,551.05 |
| Rank 4of 5 | PLNG,BS RPR,OCST,PFC,SPRPV,MBGF,SHLDR TXT,PV MK | SMITH | 2018-03-06 | $4,104,405.98 | $3,628,777.00 |
| Rank 2of 3 | PLANE ACP, ACP SURF, & PAV MARK | TITUS | 2018-03-06 | $2,670,110.86 | $2,501,081.88 |
| Rank 7of 11 | REPLACE BRIDGE AND APPROACHES | VAN ZANDT | 2018-03-06 | $1,055,741.40 | $904,834.79 |
| Rank 8of 11 | BRIDGE PREVENTIVE MAINTENANCE | GREGG | 2018-02-06 | $318,983.80 | $210,592.00 |
| Rank 10of 10 | BRIDGE PREVENTIVE MAINTENANCE | ANDERSON | 2018-02-06 | $578,743.40 | $232,132.65 |
| Rank 8of 12 | BRIDGE PREVENTIVE MAINTENANCE | GREGG | 2018-02-06 | $206,706.00 | $167,859.50 |
| Rank 6of 7 | BS RPR,PLNG,SUPRPVE,OCST,PFC,MBGF,SGNS,PV MK | HENDERSON | 2018-02-02 | $3,371,555.52 | $2,687,805.15 |
| Rank 2of 2 | TBPFC & ACP SURF,PLNG,MBGF,SHLD TXT,PV MK | GREGG | 2018-02-02 | $3,359,067.66 | $2,447,523.75 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.