Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
608 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Low bidof 4 | MILL AND INLAY | GREGG | 2018-02-02 | $1,295,634.80 | $1,295,634.80 |
| Rank 2of 4 | BS RPR,OCST,PFC,HMAC,STRS,PV MK | GREGG | 2018-02-01 | $7,159,799.97 | $6,613,692.24 |
| Rank 2of 4 | PLNG,CAM,HARST,SUPRPVE,BRG RL,MBGF,PV MK | GREGG | 2018-02-01 | $2,497,305.46 | $2,405,351.66 |
| Rank 3of 3 | OVERLAY WITH PFC | SHELBY | 2018-02-01 | $2,384,533.99 | $1,821,663.85 |
| Rank 3of 10 | BRIDGE PREVENTIVE MAINTENANCE | BOWIE | 2018-02-01 | $1,074,471.00 | $853,995.00 |
| Rank 5of 6 | CALLOUT CONCRETE PAVEMENT REPAIR | HARRISON | 2018-01-04 | $5,687,000.00 | $4,189,000.00 |
| Rank 3of 4 | PLANING,SURF,BRDG RAIL,MBGF&PV MRKS | PANOLA | 2017-12-06 | $4,498,377.90 | $4,016,607.46 |
| Rank 6of 7 | REHABILITATION OF EXISTING ROAD | HUNT | 2017-12-05 | $3,819,928.50 | $3,331,592.27 |
| Rank 8of 9 | IMPROVE GUARDRAIL AND SAFETY TREAT | NACOGDOCHES | 2017-12-05 | $2,263,429.10 | $1,578,551.00 |
| Rank 14of 14 | CONSTRUCT SIDEWALKS AND CURB RAMPS | SMITH | 2017-12-05 | $274,510.00 | $126,560.00 |
| Rank 3of 11 | CONSTRUCT HIKE & BIKE TRAIL | SMITH | 2017-11-03 | $4,833,026.75 | $4,606,677.25 |
| Rank 10of 10 | REHABILITATION OF EXISTING ROAD | HUNT | 2017-11-02 | $5,661,797.46 | $3,081,938.37 |
| Rank 7of 10 | IMPROVE GUARDRAIL AND SAFETY TREAT | SHELBY | 2017-10-04 | $1,583,613.50 | $1,118,355.83 |
| Rank 11of 11 | CONSTRUCT SIDEWALKS | CAMP | 2017-10-04 | $540,140.25 | $309,168.00 |
| Rank 7of 7 | WIDEN NON-FREEWAY | LAMAR | 2017-10-03 | $11,415,622.43 | $8,915,686.62 |
| Rank 4of 6 | UPGRADE MBGF | HARRISON | 2017-10-03 | $1,126,765.12 | $951,647.73 |
| Low bidof 4 | INSTALL TRAFFIC SIGNAL | HARRISON | 2017-09-07 | $482,088.80 | $482,088.80 |
| Rank 8of 9 | SEAL COAT, PROVIDE ADDITIONAL PAVED ROADWAY WIDTH | FRANKLIN | 2017-09-07 | $2,268,649.81 | $1,539,938.35 |
| Rank 4of 4 | INSTALL CONTINUOUS TURN LANE | LAMAR | 2017-08-09 | $2,779,301.88 | $1,691,104.67 |
| Rank 7of 7 | REHABILITATION OF EXISTING ROAD | RAINS | 2017-08-09 | $7,877,679.67 | $6,503,123.07 |
| Rank 4of 8 | RPLC BR&APPR,GRADING,ACP BS&SURF,MBGF,PV MK | SMITH | 2017-08-09 | $1,149,476.57 | $1,077,661.37 |
| Rank 3of 7 | GR,STR,BASE,SURFACING | HARRISON | 2017-08-09 | $2,532,275.73 | $2,284,633.31 |
| Rank 4of 7 | CLEAN/PAINT STEEL GRDRS,REPL BR RAIL,CONC DK OVLY | ANDERSON | 2017-08-08 | $1,897,694.65 | $1,646,254.33 |
| Rank 5of 6 | WIDEN PAVEMENT | RAINS | 2017-08-08 | $990,947.50 | $685,540.51 |
| Rank 6of 8 | CULVERT REPAIR | CHEROKEE | 2017-07-13 | $100,000.00 | $60,270.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.