Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
632 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 4of 4 | FLEXIBLE BASE | KAUFMAN | 2022-11-15 | $384,000.00 | $232,000.00 |
| Rank 2of 3 | AGGREGATE | BRAZOS | 2022-11-09 | $138,000.00 | $137,500.00 |
| Rank 2of 3 | ROCK/RIPRAP | FREESTONE | 2022-11-08 | $185,900.00 | $174,800.00 |
| Rank 3of 4 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | JASPER | 2022-11-02 | $1,659,689.50 | $1,396,803.75 |
| Low bidof 1 | FLEXIBLE BASE | WALKER | 2022-10-25 | $160,000.00 | $160,000.00 |
| Rank 2of 2 | ROCK/RIPRAP | WASHINGTON | 2022-10-25 | $210,600.00 | $147,007.00 |
| Low bidof 6 | REMOVE AND REPLACE CURB AND GUTTER | BURNET | 2022-10-12 | $139,042.00 | $139,042.00 |
| Rank 2of 3 | AGGREGATE | WASHINGTON | 2022-10-12 | $147,000.00 | $117,500.00 |
| Rank 3of 3 | FLEXIBLE BASE | ELLIS | 2022-10-12 | $114,000.00 | $101,175.00 |
| Rank 3of 3 | SAND | PECOS | 2022-10-11 | $30,400.00 | $19,300.00 |
| Rank 2of 3 | AGGREGATE | WALKER | 2022-10-11 | $197,500.00 | $167,000.00 |
| Rank 2of 7 | REMOVAL AND/OR REPLACEMENT AND/OR DISPOSAL | YOUNG | 2022-10-07 | $259,605.00 | $251,150.00 |
| Rank 2of 2 | AGGREGATE | LUBBOCK | 2022-10-07 | $112,000.00 | $75,000.00 |
| Rank 2of 2 | AGGREGATE | HALE | 2022-10-07 | $384,400.00 | $300,000.00 |
| Rank 3of 3 | DEBRIS REMOVAL | GRAYSON | 2022-10-07 | $1,023,142.00 | $479,285.00 |
| Rank 2of 3 | BRIDGE RAIL REPAIR | MCLENNAN | 2022-10-07 | $1,091,495.00 | $970,926.00 |
| Low bidof 3 | INFRASTRUCTURE IMPROVEMENTS | TYLER | 2022-10-06 | $1,846,631.83 | $1,846,631.83 |
| Rank 2of 2 | AGGREGATE | TERRY | 2022-10-06 | $798,100.00 | $669,250.00 |
| Rank 2of 2 | AGGREGATE | LAMB | 2022-10-06 | $991,000.00 | $882,600.00 |
| Low bidof 1 | SWEEPING AND DEBRIS REMOVAL | PECOS | 2022-10-06 | $421,258.49 | $421,258.49 |
| Rank 4of 6 | CLEANING AND SWEEPING HIGHWAYS | GRAYSON | 2022-10-06 | $368,301.00 | $297,950.00 |
| Rank 2of 2 | FLEXIBLE BASE | HIDALGO | 2022-10-06 | $420,400.00 | $334,700.00 |
| Rank 6of 6 | BRIDGE MAINTENANCE | ANGELINA | 2022-09-08 | $700,701.00 | $439,626.00 |
| Rank 2of 2 | REPAIR AND/OR UPGRADE OF METAL BEAM GUARD FENCE | BASTROP | 2022-09-08 | $3,142,441.00 | $2,144,000.00 |
| Rank 2of 3 | METAL BEAM GUARD FENCE REPAIR | JASPER | 2022-09-08 | $692,435.00 | $605,073.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.