Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
632 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 9of 10 | BRIDGE PREVENTATIVE MAINTENANCE | ANGELINA | 2022-09-08 | $729,730.00 | $428,990.00 |
| Low bidof 1 | ROCK/RIPRAP | WHARTON | 2022-08-31 | $262,500.00 | $262,500.00 |
| Low bidof 2 | FLEXIBLE BASE | BROWN | 2022-08-30 | $125,525.00 | $125,525.00 |
| Rank 2of 4 | WINTER WEATHER MATERIAL | LUBBOCK | 2022-08-23 | $219,800.00 | $181,600.00 |
| Rank 3of 4 | FLEXIBLE BASE | NAVARRO | 2022-08-23 | $112,000.00 | $84,000.00 |
| Rank 2of 3 | ROCK/RIPRAP | WALKER | 2022-08-16 | $219,700.00 | $207,900.00 |
| Rank 2of 2 | ROCK/RIPRAP | COLLIN | 2022-08-09 | $34,800.00 | $30,000.00 |
| Low bidof 5 | SWEEPING & DEBRIS REMOVAL | WISE | 2022-08-04 | $1,145,522.20 | $1,145,522.20 |
| Rank 2of 2 | HYDRAULIC CEMENT | ARMSTRONG | 2022-08-04 | $897,750.00 | $552,750.00 |
| Rank 2of 3 | CLEANING AND SWEEPING HIGHWAYS | WEBB | 2022-08-04 | $670,507.00 | $605,376.00 |
| Rank 4of 4 | FLEXIBLE BASE | POTTER | 2022-08-04 | $1,968,092.00 | $1,478,541.80 |
| Rank 3of 3 | SWEEPING AND DEBRIS REMOVAL | HIDALGO | 2022-08-04 | $3,581,664.40 | $1,762,479.75 |
| Low bidof 3 | HAZARD ELIMINATION & SAFETY | HOCKLEY | 2022-08-03 | $1,890,330.00 | $1,890,330.00 |
| Low bidof 2 | ROCK/RIP RAP | HUNT | 2022-08-03 | $439,200.00 | $439,200.00 |
| Rank 3of 4 | CABLE BARRIER REPAIR | NACOGDOCHES | 2022-08-03 | $235,271.00 | $189,150.00 |
| Rank 2of 2 | AGGREGATE (MATERIAL ONLY) | HENDERSON | 2022-08-03 | $3,770,849.86 | $2,616,350.00 |
| Low bidof 2 | FLEXIBLE BASE | COLLIN | 2022-07-26 | $190,000.00 | $190,000.00 |
| Rank 3of 3 | HAZARD ELIMINATION & SAFETY | FALLS | 2022-06-30 | $2,569,707.72 | $2,042,766.00 |
| Rank 2of 4 | METAL BEAM GUARD FENCE REPAIR | JOHNSON | 2022-06-29 | $2,781,819.00 | $1,798,404.00 |
| Rank 2of 3 | FLEX BASE - MATERIAL ONLY | TRAVIS | 2022-06-15 | $203,495.00 | $190,000.00 |
| Rank 3of 4 | FLEXIBLE BASE | WASHINGTON | 2022-06-14 | $110,060.00 | $104,300.00 |
| Rank 3of 3 | FLOWABLE FILL | FREESTONE | 2022-06-14 | $300,240.00 | $268,000.00 |
| Rank 2of 3 | FLOWABLE FILL | WALKER | 2022-06-14 | $299,215.00 | $268,000.00 |
| Rank 4of 5 | ROCK/RIPRAP | BRAZOS | 2022-06-07 | $236,031.30 | $214,100.00 |
| Rank 3of 4 | ROCK/RIPRAP | WASHINGTON | 2022-06-07 | $247,493.80 | $218,700.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.