Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
632 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Low bidof 3 | REHABILITATE EXISTING ROADWAY | HALE | 2023-12-06 | $1,764,772.00 | $1,764,772.00 |
| Rank 2of 6 | BRIDGE REPAIR | LUBBOCK | 2023-12-06 | $1,266,420.00 | $1,197,424.00 |
| Low bidof 3 | FLEXIBLE BASE | MCLENNAN | 2023-12-06 | $2,135,050.00 | $2,135,050.00 |
| Rank 11of 12 | BRIDGE PREVENTATIVE MAINTENANCE | HALL | 2023-12-05 | $807,000.00 | $421,800.00 |
| Rank 5of 7 | BRIDGE MAINTENANCE | LUBBOCK | 2023-11-02 | $1,695,986.00 | $1,420,057.00 |
| Rank 2of 6 | BRIDGE REPLACEMENT | FISHER | 2023-11-02 | $738,494.00 | $684,071.00 |
| Rank 2of 3 | LITTER REMOVAL | TRAVIS | 2023-11-02 | $785,230.00 | $645,590.00 |
| Rank 2of 3 | METAL BEAM GUARD FENCE REPAIR | FREESTONE | 2023-11-01 | $493,890.00 | $440,007.00 |
| Low bidof 3 | POTHOLE REPAIR | DALLAS | 2023-11-01 | $591,843.00 | $591,843.00 |
| Rank 2of 2 | PAINT AND BEADS | TAYLOR | 2023-10-27 | $76,160.00 | $73,775.80 |
| Rank 4of 4 | ROCK/RIPRAP | WALKER | 2023-10-25 | $235,400.00 | $184,900.00 |
| Rank 2of 8 | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | BELL | 2023-10-06 | $249,469.17 | $236,667.36 |
| Rank 2of 3 | METAL BEAM GUARD FENCE REPAIR | HOWARD | 2023-10-06 | $1,479,706.00 | $1,384,501.00 |
| Low bidof 8 | HAZARD ELIMINATION & SAFETY | MCLENNAN | 2023-10-05 | $648,860.00 | $648,860.00 |
| Rank 2of 4 | ROCK/RIPRAP | HUNT | 2023-10-05 | $597,000.00 | $582,000.00 |
| Low bidof 2 | SWEEPING AND DEBRIS REMOVAL | TARRANT | 2023-09-07 | $1,967,826.08 | $1,967,826.08 |
| Rank 2of 2 | CLEANING AND SWEEPING HIGHWAYS | ECTOR | 2023-09-07 | $764,172.00 | $389,412.00 |
| Low bidof 3 | SWEEPING AND DEBRIS REMOVAL | NUECES | 2023-09-06 | $1,669,000.40 | $1,669,000.40 |
| Low bidof 3 | SWEEPING AND DEBRIS REMOVAL | JEFFERSON | 2023-08-02 | $1,379,472.96 | $1,379,472.96 |
| Low bidof 2 | SWEEPING AND DEBRIS REMOVAL | CAMERON | 2023-08-02 | $715,315.86 | $715,315.86 |
| Low bidof 3 | SWEEPING AND DEBRIS REMOVAL | COLLIN | 2023-06-28 | $883,358.00 | $883,358.00 |
| Low bidof 2 | POTHOLE REPAIR | COLLIN | 2023-06-28 | $589,015.00 | $589,015.00 |
| Rank 2of 3 | CLEANING AND SWEEPING HIGHWAYS | DENTON | 2023-06-28 | $899,064.40 | $572,142.00 |
| Rank 2of 3 | CLEANING AND SWEEPING HIGHWAYS | ELLIS | 2023-06-28 | $1,304,613.70 | $541,558.25 |
| Rank 2of 3 | SWEEPING AND DEBRIS REMOVAL | TARRANT | 2023-06-28 | $1,446,535.03 | $1,310,142.23 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.