Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
632 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 4of 4 | SWEEPING AND DEBRIS REMOVAL | BRAZORIA | 2023-06-28 | $2,132,000.00 | $1,197,381.23 |
| Low bidof 5 | INSTALLATION OF DRIVEWAY PIPE | BRAZOS | 2023-06-27 | $949,656.00 | $949,656.00 |
| Low bidof 5 | FLEXIBLE BASE | BEXAR | 2023-06-21 | $278,100.00 | $278,100.00 |
| Rank 2of 2 | ROCK/RIPRAP | BEXAR | 2023-06-21 | $279,350.00 | $270,121.00 |
| Low bidof 3 | SMALL SIGN MAINTENANCE | TRAVIS | 2023-06-14 | $139,475.00 | $139,475.00 |
| Rank 5of 5 | SAND | MIDLAND | 2023-03-14 | $29,400.00 | $17,750.00 |
| Rank 2of 2 | AGGREGATE | COLLIN | 2023-03-14 | $234,000.00 | $210,000.00 |
| Rank 3of 4 | ROCK/RIPRAP | JEFFERSON | 2023-03-14 | $206,400.00 | $121,750.00 |
| Rank 2of 3 | PAINT AND BEADS | WICHITA | 2023-03-09 | $213,000.00 | $157,240.00 |
| Low bidof 4 | FLEXIBLE BASE | CHILDRESS | 2023-02-24 | $228,000.00 | $228,000.00 |
| Rank 4of 4 | FLEXIBLE BASE | FAYETTE | 2023-02-22 | $238,500.00 | $166,530.00 |
| Rank 3of 3 | ROCK/RIPRAP | FAYETTE | 2023-02-22 | $117,600.00 | $101,500.00 |
| Rank 3of 3 | LIME | FAYETTE | 2023-02-22 | $27,300.00 | $25,200.00 |
| Low bidof 2 | FLEXIBLE BASE | COLLIN | 2023-02-22 | $220,000.00 | $220,000.00 |
| Rank 2of 2 | FLEXIBLE BASE | RUSK | 2023-02-14 | $364,500.00 | $217,500.00 |
| Rank 2of 2 | FLEXIBLE BASE | WOOD | 2023-02-14 | $326,550.00 | $238,000.00 |
| Rank 4of 5 | METAL BEAM GUARD FENCE REPAIR | FAYETTE | 2023-02-02 | $1,750,299.00 | $1,382,686.88 |
| Rank 2of 3 | ROCK/RIPRAP | BASTROP | 2023-02-01 | $374,250.00 | $362,650.00 |
| Rank 2of 2 | PAINT AND BEADS (MATERIALS ONLY) | BROWN | 2023-01-26 | $289,960.00 | $265,100.00 |
| Rank 2of 4 | REPAIR/UPGRADE & MAINTENANCE OF MBGF | SAN AUGUSTINE | 2023-01-18 | $189,853.00 | $169,773.00 |
| Low bidof 3 | AGGREGATE | WALKER | 2023-01-11 | $181,500.00 | $181,500.00 |
| Rank 2of 2 | LIME | WHARTON | 2023-01-10 | $29,400.00 | $27,300.00 |
| Rank 3of 3 | FLEXIBLE BASE | WHARTON | 2023-01-10 | $366,000.00 | $251,250.00 |
| Rank 2of 3 | ROCK/RIPRAP | WHARTON | 2023-01-10 | $136,850.00 | $119,000.00 |
| Rank 4of 4 | HYDRAULIC CEMENT | WHARTON | 2023-01-10 | $88,200.00 | $37,800.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.