Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
511 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 5of 5 | HOT MIX | DEWITT | 2021-06-07 | $324,000.00 | $265,500.00 |
| Rank 3of 5 | HOT MIX | GONZALES | 2021-06-07 | $294,400.00 | $253,000.00 |
| Rank 4of 4 | BASE FAILURE PAVEMENT REPAIR | BELL | 2021-06-04 | $1,386,982.60 | $749,996.28 |
| Rank 4of 4 | BASE FAILURE PAVEMENT REPAIR | CORYELL | 2021-06-04 | $675,058.95 | $372,500.50 |
| Rank 5of 5 | HOT MIX | BELL | 2021-05-06 | $797,750.00 | $656,600.00 |
| Rank 5of 9 | RESURFACE ROADWAY | BEXAR | 2021-05-05 | $10,726,061.21 | $8,387,879.05 |
| Rank 8of 9 | RESURFACE ROADWAY | COMANCHE | 2021-05-05 | $3,295,046.60 | $2,320,588.82 |
| Rank 4of 7 | ON CALL SPOT REPAIRS | GONZALES | 2021-04-08 | $933,000.00 | $756,100.00 |
| Rank 3of 4 | RESURFACE ROADWAY | BELL | 2021-03-05 | $1,798,135.81 | $1,390,231.41 |
| Rank 3of 7 | SEAL COAT | CALDWELL | 2021-02-05 | $4,385,033.32 | $4,094,875.13 |
| Rank 2of 6 | LEVEL UP, FDR, & OVERLAY | HAYS | 2021-02-05 | $2,315,593.36 | $2,276,991.23 |
| Rank 3of 5 | RESURFACE ROADWAY | WILLIAMSON | 2021-02-04 | $1,075,801.85 | $976,594.31 |
| Rank 3of 7 | FULL DEPTH REPAIR, LEVEL-UP & TOM | LEE | 2021-01-08 | $3,228,046.15 | $2,887,592.71 |
| Rank 2of 5 | MILL-INLAY & SPOT BASE REPAIR | VAL VERDE | 2021-01-08 | $1,419,819.60 | $1,345,886.00 |
| Rank 2of 7 | REHABILITATE EXISTING ROADWAY | BASTROP | 2021-01-07 | $1,031,965.90 | $1,022,332.81 |
| Rank 7of 7 | SPOT REPAIR MILL AND FILL | TAYLOR | 2020-12-03 | $1,504,781.70 | $914,854.20 |
| Low bidof 5 | FRONTAGE OVERLAYS | TRAVIS | 2020-12-03 | $3,389,908.66 | $3,389,908.66 |
| Rank 3of 6 | OVERLAY | BLANCO | 2020-12-02 | $3,031,196.43 | $2,768,423.25 |
| Rank 3of 7 | FULL DEPTH REPAIR, LEVEL-UP & TOM | LEE | 2020-11-05 | $3,768,711.09 | $3,551,104.16 |
| Rank 3of 4 | ACP OVERLAY | FAYETTE | 2020-11-04 | $11,106,267.74 | $10,399,532.43 |
| Low bidof 6 | OVERLAY | BURNET | 2020-11-04 | $2,046,868.15 | $2,046,868.15 |
| Rank 3of 7 | RESURFACE ROADWAY | HAYS | 2020-11-04 | $1,928,685.83 | $1,671,959.50 |
| Rank 3of 4 | PREVENTIVE MAINTENANCE | TRAVIS | 2020-10-01 | $1,672,322.20 | $1,434,745.91 |
| Rank 3of 7 | SEAL COAT | GILLESPIE | 2020-09-04 | $2,768,952.36 | $2,621,445.43 |
| Low bidof 5 | SEAL COAT AND PROFILE MARKINGS | BASTROP | 2020-09-04 | $2,490,260.40 | $2,490,260.40 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.