Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
511 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 3of 6 | HOT MIX CL ASPHALT CONCRETE PAVEMENT-MATERIAL ONLY | HAYS | 2020-09-04 | $514,505.00 | $460,500.00 |
| Low bidof 4 | REPAIR, LEVEL UP, & SEAL COAT | WILLIAMSON | 2020-09-03 | $3,986,286.37 | $3,986,286.37 |
| Low bidof 6 | REPAIR, LEVEL-UP AND SEAL COAT | HAYS | 2020-09-03 | $1,256,562.09 | $1,256,562.09 |
| Rank 2of 7 | MATERIAL ONLY (HOT MIX CL ASPHALT CONCRETE PVMT) | BLANCO | 2020-09-03 | $800,974.00 | $742,075.00 |
| Rank 5of 6 | BASE REPAIR | GUADALUPE | 2020-08-06 | $1,984,803.05 | $1,751,100.05 |
| Rank 3of 7 | BASE REPAIR | BEXAR | 2020-08-05 | $2,716,126.46 | $2,587,245.75 |
| Low bidof 5 | LEVEL-UP, REPAIR, OVERLAY & PVMNT MRK | BASTROP | 2020-07-09 | $2,826,332.68 | $2,826,332.68 |
| Low bidof 3 | OVERLAY, MILL AND INLAY TOM FR ONLY | TRAVIS | 2020-07-09 | $1,949,774.04 | $1,949,774.04 |
| Low bidof 3 | OVERLAY | MASON | 2020-07-09 | $1,046,950.51 | $1,046,950.51 |
| Rank 2of 7 | PAVEMENT REPAIR | MEDINA | 2020-07-09 | $1,962,560.55 | $1,879,399.85 |
| Low bidof 4 | OVERLAY | WILLIAMSON | 2020-07-08 | $1,976,494.25 | $1,976,494.25 |
| Rank 2of 7 | PAVEMENT REPAIR | KERR | 2020-07-08 | $980,030.85 | $959,228.30 |
| Rank 4of 5 | MILL AND INALY | BEXAR | 2020-05-08 | $1,608,332.36 | $1,301,146.03 |
| Rank 4of 5 | US 79 OVERLAY | MILAM | 2020-05-07 | $2,360,325.27 | $1,914,085.70 |
| Low bidof 7 | ROUTINE MAINTENANCE CONTRACT | BEXAR | 2020-04-15 | $195,504.63 | $195,504.63 |
| Rank 3of 5 | BASE REPAIR, MILL, INLAY & PV MRKS ON FRONTAGE RDS | BEXAR | 2020-03-05 | $5,019,404.81 | $4,775,401.10 |
| Rank 2of 4 | ASPHALTIC PAVEMENT REPAIRS | TRAVIS | 2020-03-05 | $4,072,650.00 | $3,486,391.00 |
| Rank 3of 4 | MILL AND INLAY | WILLIAMSON | 2020-03-05 | $834,984.45 | $770,514.50 |
| Rank 3of 5 | BASE REPAIR, MILL, INLAY, OVERLAY & PAV MARKS | BEXAR | 2020-03-04 | $2,683,751.35 | $2,608,775.25 |
| Low bidof 8 | OVERLAY | GILLESPIE | 2020-02-07 | $2,725,725.31 | $2,725,725.31 |
| Rank 5of 6 | INSTALL TWO-WAY LEFT TURN LANE | MILAM | 2020-02-07 | $487,049.30 | $376,466.30 |
| Rank 4of 4 | ASPHALTIC CONCRETE OVERLAY | CORYELL | 2020-02-06 | $3,971,179.00 | $2,987,724.20 |
| Rank 2of 4 | MILL, SEAL & THIN OV FRONTAGE ROADS | TRAVIS | 2020-02-06 | $2,052,391.60 | $1,998,095.87 |
| Rank 2of 6 | LEVEL UP, FDR AND OVERLAY | TRAVIS | 2020-02-06 | $986,392.45 | $931,784.13 |
| Rank 2of 4 | OVERLAY | TRAVIS | 2020-02-06 | $1,420,114.40 | $1,367,723.80 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.