Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
216 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 8of 9 | ROADWAY IMPROVEMENTS | HARRIS | 2020-08-06 | $2,588,445.53 | $1,915,649.70 |
| Rank 2of 3 | ASPHALT PAVEMENT REPAIR | GALVESTON | 2020-07-09 | $499,723.60 | $481,515.00 |
| Rank 2of 2 | ASPHALT PAVEMENT REPAIR | WALLER | 2020-06-04 | $451,150.00 | $395,350.00 |
| Low bidof 2 | ASPHALT PAVEMENT REPAIR | FORT BEND | 2020-04-14 | $300,140.00 | $300,140.00 |
| Rank 4of 5 | SCOUR COUNTERMEASURES AT GRASSY CREEK | GRIMES | 2020-04-14 | $160,982.00 | $128,430.00 |
| Low bidof 3 | ASPHALT PAVEMENT REPAIR | HARRIS | 2020-04-09 | $1,482,030.00 | $1,482,030.00 |
| Rank 4of 4 | SH 75 TOM OVERLAY, WIDENING, RESTRIPING | WALKER | 2020-04-01 | $506,379.70 | $372,661.77 |
| Rank 4of 6 | BRIDGE REPAIR | MONTGOMERY | 2020-03-13 | $258,851.00 | $177,150.00 |
| Rank 4of 5 | REPAIR STEEL BRIDGE MEMBERS | HARRIS | 2020-03-13 | $219,714.00 | $174,426.00 |
| Rank 4of 4 | MILL AND OVERLAY | MONTGOMERY | 2020-03-05 | $810,302.50 | $620,837.50 |
| Rank 4of 6 | MISCELLANEOUS BRIDGE REPAIR | WALLER | 2020-03-04 | $225,475.00 | $149,525.00 |
| Low bidof 3 | ASPHALT PAVEMENT REPAIR | MONTGOMERY | 2020-01-21 | $343,000.00 | $343,000.00 |
| Rank 5of 5 | SEAL COAT, ACP OVERLAY, SIGNING & PVMT MARK | FORT BEND | 2019-12-04 | $1,514,995.62 | $1,038,125.78 |
| Rank 3of 4 | BRIDGE MAINTENANCE | COLORADO | 2019-12-03 | $6,895,869.00 | $4,243,334.00 |
| Rank 7of 8 | SLOPE REPAIR TO NORTH/SOUTH SH 6 | GRIMES | 2019-12-03 | $3,147,978.80 | $1,445,358.55 |
| Rank 2of 2 | ASPHALT AND POTHOLE REPAIR | HARRIS | 2019-11-12 | $278,975.00 | $167,175.00 |
| Rank 4of 6 | PERMANENT BRIDGE REPAIRS NBI# 12102027115377 | HARRIS | 2019-11-06 | $3,768,961.05 | $3,159,415.95 |
| Low bidof 3 | ASPHALT PAVEMENT REPAIR | GALVESTON | 2019-11-06 | $478,759.20 | $478,759.20 |
| Low bidof 3 | REPLACE BEARING PADS | HARRIS | 2019-06-05 | $578,700.00 | $578,700.00 |
| Rank 2of 2 | REPAIR OF FLEXIBLE PAVEMENT | BRAZORIA | 2019-06-04 | $575,460.00 | $465,685.00 |
| Low bidof 5 | PFC MILL AND INLAY | LIBERTY | 2019-03-06 | $1,514,862.40 | $1,514,862.40 |
| Rank 4of 5 | MILL AND OVERLAY | MONTGOMERY | 2019-03-06 | $421,415.76 | $280,461.21 |
| Rank 3of 5 | FULL DEPTH REPAIR, PAVEMENT MARKINGS & OVERLAY | MONTGOMERY | 2019-03-05 | $2,668,260.89 | $2,483,807.00 |
| Rank 2of 2 | ASPHALT PAVEMENT REPAIR | MONTGOMERY | 2019-02-12 | $263,100.00 | $257,100.00 |
| Rank 5of 6 | OVERLAY AND PAVEMENT REPAIR | LIBERTY | 2019-02-05 | $994,995.09 | $780,011.85 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.