Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
216 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Low bidof 5 | PLANE AND OVERLAY | CHAMBERS | 2019-01-08 | $380,486.72 | $380,486.72 |
| Low bidof 2 | ASPHALT PAVEMENT REPAIR | HARRIS | 2018-12-06 | $888,750.00 | $888,750.00 |
| Rank 2of 2 | ASPHALT PAVEMENT REPAIR | GALVESTON | 2018-11-06 | $513,260.00 | $479,090.00 |
| Rank 4of 4 | MILLING, 1.5" ACP OVERLAY AND PAVEMENT MARKINGS | BRAZORIA | 2018-09-07 | $1,765,463.93 | $1,335,803.72 |
| Rank 2of 3 | REPAIR OF FLEXIBLE PAVEMENT | BRAZORIA | 2018-08-14 | $266,905.20 | $236,830.00 |
| Rank 4of 6 | BASE REPAIR, OCST, LEVEL UP, OV | MONTGOMERY | 2018-08-08 | $3,334,568.63 | $3,164,972.67 |
| Rank 2of 4 | BASE REPAIR, OCST, LEVEL UP, OVERLAY | MONTGOMERY | 2018-07-11 | $1,905,705.41 | $1,738,187.35 |
| Rank 6of 9 | REPLACE BRIDGE AND APPROACHES | AUSTIN | 2018-07-10 | $509,669.30 | $410,493.11 |
| Rank 3of 5 | BASE REPAIR, PLANING, ACP OL, SIGNING & PVMT MARK | FORT BEND | 2018-07-10 | $1,807,867.73 | $1,518,766.78 |
| Low bidof 9 | BRIDGE REPLACEMENT | MONTGOMERY | 2018-06-06 | $1,087,296.75 | $1,087,296.75 |
| Rank 6of 7 | REPLACE EXISTING BRIDGE | WASHINGTON | 2018-06-06 | $435,743.00 | $341,287.96 |
| Rank 4of 5 | HMA MILL AND INLAY | WASHINGTON | 2018-06-06 | $895,678.00 | $616,781.00 |
| Low bidof 2 | ASPHALT PAVEMENT REPAIR | WALLER | 2018-06-06 | $348,180.00 | $348,180.00 |
| Rank 2of 5 | MILL AND OVERLAY | MONTGOMERY | 2018-05-02 | $1,098,037.18 | $1,042,517.33 |
| Rank 2of 3 | MILL, SEAL COAT, OVERLAY | GALVESTON | 2018-05-01 | $696,862.76 | $639,412.88 |
| Rank 2of 5 | OVERLAY AND PAVEMENT REPAIR | LIBERTY | 2018-05-01 | $808,210.17 | $797,673.48 |
| Low bidof 2 | ASPHALT PAVEMENT REPAIR | FORT BEND | 2018-04-10 | $221,710.00 | $221,710.00 |
| Low bidof 5 | REPLACE BEARING PADS | HARRIS | 2018-04-10 | $138,300.00 | $138,300.00 |
| Rank 4of 4 | PROVIDE ADDITIONAL SURFACE_WIDTH | CHAMBERS | 2018-04-04 | $383,109.90 | $328,471.82 |
| Rank 2of 2 | ASPHALT PAVEMENT REPAIR | MONTGOMERY | 2018-04-04 | $276,900.00 | $264,600.00 |
| Rank 3of 3 | REPLACE MBGF, LEVEL UP, TOM | GALVESTON | 2018-03-07 | $687,663.00 | $625,529.30 |
| Rank 3of 4 | OVERLAY | CHAMBERS | 2018-03-07 | $919,867.52 | $839,543.27 |
| Rank 4of 5 | LEVEL-UP/OVERLAY | LIBERTY | 2018-03-06 | $1,023,346.00 | $845,384.55 |
| Rank 4of 7 | MILL AND OVERLAY | MONTGOMERY | 2018-03-06 | $663,568.82 | $551,281.48 |
| Rank 3of 4 | FLEXIBLE PAVEMENT STRUCTURE REPAIRS | JEFFERSON | 2018-03-06 | $632,364.00 | $537,909.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.