Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
216 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Low bidof 2 | ASPHALT AND POTHOLE REPAIR | HARRIS | 2018-02-15 | $181,750.00 | $181,750.00 |
| Rank 3of 10 | REPLACE BRIDGE AND APPROACHES | AUSTIN | 2018-02-02 | $4,059,355.41 | $3,793,059.92 |
| Rank 6of 6 | BASE REPAIR AND OVERLAY | FORT BEND | 2017-10-04 | $1,099,743.95 | $851,224.00 |
| Rank 3of 5 | OVERLAY | LIBERTY | 2017-08-09 | $663,185.56 | $605,866.50 |
| Rank 5of 6 | OVERLAY | GRIMES | 2017-08-08 | $2,633,844.37 | $2,078,724.66 |
| Rank 2of 2 | REPAIR OF FLEXIBLE PAVEMENT | BRAZORIA | 2017-07-18 | $257,010.00 | $246,750.00 |
| Low bidof 2 | ASPHALT PAVEMENT REPAIR | FORT BEND | 2017-04-11 | $264,040.00 | $264,040.00 |
| Low bidof 3 | OVERLAY ROADWAY | JEFFERSON | 2017-02-03 | $624,886.23 | $624,886.23 |
| Rank 8of 8 | SFTY TR FX OBJS | MONTGOMERY | 2017-02-02 | $1,899,182.24 | $978,908.20 |
| Rank 4of 4 | BASE REPAIR AND 1.5" OVERLAY | FORT BEND | 2017-02-02 | $2,383,214.20 | $1,774,560.91 |
| Rank 4of 4 | HMA MILL AND INLAY | WALKER | 2017-01-05 | $931,682.00 | $616,698.00 |
| Rank 6of 8 | FLEXIBLE PAVEMENT REPAIRS | HARDIN | 2017-01-05 | $1,494,470.15 | $1,166,409.50 |
| Rank 2of 3 | 3/4"TOM-F & 1"TOM-C,MILLING,SEAL COAT & STRIPPING | GALVESTON | 2017-01-04 | $615,273.30 | $564,892.18 |
| Rank 4of 8 | CONSTRUCTION OF SIDEWALKS | CHAMBERS | 2016-12-01 | $1,189,605.10 | $964,954.45 |
| Low bidof 5 | PLANE AND OVERLAY | CHAMBERS | 2016-11-04 | $637,843.52 | $637,843.52 |
| Rank 3of 4 | BASE REPAIR, SEAL COAT, 1.5" OVERLAY & STRIPING | GALVESTON | 2016-11-03 | $1,086,076.94 | $890,749.70 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.