Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
427 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 7 | GR, STRS, ACP BS & SURF, C&G | VAN ZANDT | 2018-03-07 | $519,955.20 | $496,651.35 |
| Rank 3of 3 | ACP SURFACE & PAV MARKINGS | BOWIE | 2018-03-07 | $1,401,684.83 | $1,149,721.78 |
| Rank 3of 3 | TEXTURIZE SHOULDERS & CL TEXTURING | CASS | 2018-03-07 | $4,015,564.56 | $3,512,191.16 |
| Rank 5of 10 | REPLACE BRIDGE & APPROACHES | SMITH | 2018-03-07 | $917,857.85 | $833,389.25 |
| Rank 10of 10 | SLOPE FAILURE REPAIR | ROCKWALL | 2018-03-07 | $3,339,101.75 | $2,226,102.00 |
| Rank 4of 4 | PLANE, LEVEL-UP AND PFC | SHELBY | 2018-03-06 | $11,951,133.20 | $9,572,121.03 |
| Rank 3of 7 | BRIDGE REPLACEMENT | ANGELINA | 2018-03-06 | $1,098,372.13 | $1,023,277.64 |
| Rank 4of 11 | SAFETY TREAT FIXED OBJECTS | BOWIE | 2018-03-06 | $1,646,279.36 | $1,463,551.05 |
| Rank 3of 3 | PLANE ACP, ACP SURF, & PAV MARK | TITUS | 2018-03-06 | $2,820,528.84 | $2,501,081.88 |
| Rank 3of 11 | REPLACE BRIDGE AND APPROACHES | VAN ZANDT | 2018-03-06 | $975,810.45 | $904,834.79 |
| Rank 6of 7 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH | TYLER | 2018-03-06 | $670,322.40 | $509,224.47 |
| Rank 7of 7 | BS RPR,PLNG,SUPRPVE,OCST,PFC,MBGF,SGNS,PV MK | HENDERSON | 2018-02-02 | $3,427,600.39 | $2,687,805.15 |
| Rank 4of 4 | MILL AND INLAY | GREGG | 2018-02-02 | $1,485,345.24 | $1,295,634.80 |
| Rank 3of 4 | BS RPR,OCST,PFC,HMAC,STRS,PV MK | GREGG | 2018-02-01 | $7,196,028.40 | $6,613,692.24 |
| Rank 3of 4 | PLNG,CAM,HARST,SUPRPVE,BRG RL,MBGF,PV MK | GREGG | 2018-02-01 | $2,499,661.79 | $2,405,351.66 |
| Rank 4of 5 | US 190 ETC FLEX PAVE STRUCTURE REP | JASPER | 2018-02-01 | $914,528.00 | $562,947.48 |
| Rank 7of 13 | REPLACE BRIDGE AND APPROACHES | NAVARRO | 2017-12-06 | $3,248,078.72 | $2,595,949.99 |
| Rank 4of 5 | REHABILITATION OF EXISTING ROAD | FANNIN | 2017-12-06 | $6,115,534.44 | $4,843,711.66 |
| Rank 4of 4 | PLANING,SURF,BRDG RAIL,MBGF&PV MRKS | PANOLA | 2017-12-06 | $4,692,202.61 | $4,016,607.46 |
| Rank 3of 3 | CONSTRUCT SHARED USE PATH | RED RIVER | 2017-12-05 | $755,014.25 | $519,916.50 |
| Rank 6of 9 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH | FANNIN | 2017-12-05 | $1,932,418.91 | $1,344,262.88 |
| Rank 4of 7 | REHABILITATION OF EXISTING ROAD | HUNT | 2017-12-05 | $3,618,356.75 | $3,331,592.27 |
| Rank 2of 9 | IMPROVE GUARDRAIL AND SAFETY TREAT | NACOGDOCHES | 2017-12-05 | $1,601,964.10 | $1,578,551.00 |
| Rank 13of 14 | CONSTRUCT SIDEWALKS AND CURB RAMPS | SMITH | 2017-12-05 | $243,260.00 | $126,560.00 |
| Rank 8of 8 | RIPRAP/SPALL REPAIR | JASPER | 2017-11-08 | $618,590.00 | $193,184.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.