Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
427 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 6of 11 | CONSTRUCT HIKE & BIKE TRAIL | SMITH | 2017-11-03 | $5,075,837.50 | $4,606,677.25 |
| Rank 8of 10 | REHABILITATION OF EXISTING ROAD | RED RIVER | 2017-11-03 | $2,867,194.25 | $2,040,371.54 |
| Rank 5of 8 | PROVIDE ADDITIONAL PAVED SURF WIDTH | ANGELINA | 2017-11-02 | $658,364.82 | $459,200.62 |
| Rank 5of 10 | IMPROVE GUARDRAIL AND SAFETY TREAT | SHELBY | 2017-10-04 | $1,318,958.30 | $1,118,355.83 |
| Rank 9of 11 | CONSTRUCT SIDEWALKS | CAMP | 2017-10-04 | $483,899.90 | $309,168.00 |
| Rank 5of 5 | RECONSTRUCT AND WIDEN PAVEMENT | TRINITY | 2017-10-04 | $5,009,294.35 | $4,311,589.97 |
| Rank 8of 9 | CULVERT REPAIR | VAN ZANDT | 2017-10-03 | $674,905.00 | $430,297.43 |
| Rank 2of 4 | INSTALL TRAFFIC SIGNAL | HARRISON | 2017-09-07 | $504,585.35 | $482,088.80 |
| Rank 7of 9 | SEAL COAT, PROVIDE ADDITIONAL PAVED ROADWAY WIDTH | FRANKLIN | 2017-09-07 | $1,991,320.09 | $1,539,938.35 |
| Rank 4of 7 | DRAINAGE STRUCTURE MAINTENANCE | UPSHUR | 2017-08-16 | $131,371.43 | $99,921.45 |
| Rank 6of 7 | REHABILITATION OF EXISTING ROAD | RAINS | 2017-08-09 | $6,793,843.24 | $6,503,123.07 |
| Rank 3of 8 | RPLC BR&APPR,GRADING,ACP BS&SURF,MBGF,PV MK | SMITH | 2017-08-09 | $1,126,610.12 | $1,077,661.37 |
| Low bidof 7 | GR,STR,BASE,SURFACING | HARRISON | 2017-08-09 | $2,284,633.31 | $2,284,633.31 |
| Rank 5of 5 | SAFETY TREAT FIXED OBJECTS | HOUSTON | 2017-08-08 | $2,246,814.75 | $1,576,406.00 |
| Rank 5of 7 | CLEAN/PAINT STEEL GRDRS,REPL BR RAIL,CONC DK OVLY | ANDERSON | 2017-08-08 | $1,984,467.70 | $1,646,254.33 |
| Low bidof 6 | WIDEN PAVEMENT | RAINS | 2017-08-08 | $685,540.51 | $685,540.51 |
| Rank 6of 7 | REPLACE BRIDGE AND APPROACHES | ORANGE | 2017-08-08 | $474,616.50 | $316,837.10 |
| Low bidof 5 | CMT TRT BASE, ACP & PVMT MARKINGS | BOWIE | 2017-07-12 | $798,693.00 | $798,693.00 |
| Rank 6of 8 | BRIDGE REPLACEMENT | SHELBY | 2017-07-12 | $768,740.35 | $619,833.67 |
| Rank 4of 5 | SAFETY TREAT FIXED OBJECTS | TYLER | 2017-07-12 | $1,677,129.50 | $1,224,577.50 |
| Rank 6of 7 | GR, FLX BS, TCST, STRS, PV MK | VAN ZANDT | 2017-07-12 | $4,543,996.52 | $3,972,777.00 |
| Rank 4of 7 | REPLACE BRIDGE AND APPROACHES | HARRISON | 2017-07-12 | $474,900.25 | $444,410.70 |
| Rank 6of 6 | PLNING,BASE REPAIR,MEMB UNDRSL,SUPER PAV,PV MK | SMITH | 2017-07-12 | $4,858,781.90 | $3,624,096.35 |
| Rank 2of 5 | REMOVE & REPLACE 2 STRUCTURES | SAN AUGUSTINE | 2017-07-11 | $5,301,790.25 | $5,292,158.61 |
| Rank 4of 8 | GR, FLX BS, TCST, STRS, PVT MRKG | VAN ZANDT | 2017-07-11 | $5,226,679.51 | $4,481,848.93 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.