Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
127 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Low bidof 6 | BRIDGE REPLACEMENT | CAMERON | 2021-06-04 | $1,147,081.10 | $1,147,081.10 |
| Rank 5of 5 | REHABILITATE EXISTING ROADWAY | HIDALGO | 2021-03-05 | $4,204,378.88 | $3,118,299.07 |
| Low bidof 5 | PREVENTIVE MAINTENANCE | HIDALGO | 2021-02-05 | $5,388,775.40 | $5,388,775.40 |
| Rank 6of 7 | REHABILITATION | CAMERON | 2020-11-05 | $6,249,553.51 | $4,728,315.84 |
| Rank 2of 5 | OVERLAY | HIDALGO | 2020-11-05 | $5,350,529.79 | $4,998,520.95 |
| Rank 2of 2 | PAVEMENT REHABILITATION OF FRONTAGE ROADS | HIDALGO | 2019-02-05 | $4,708,195.44 | $2,966,777.57 |
| Rank 2of 3 | DISTRICTWIDE OVERLAY | HIDALGO | 2019-01-08 | $5,435,251.77 | $5,265,199.45 |
| Rank 2of 4 | REHABILITATE ROADWAY | BROOKS | 2018-11-06 | $18,132,753.20 | $17,284,414.20 |
| Rank 4of 5 | OVERLAY | CAMERON | 2018-10-02 | $10,544,518.31 | $8,734,018.37 |
| Rank 4of 4 | OVERLAY ROADWAY (NB AND SB LANES) | SAN PATRICIO | 2018-03-07 | $6,329,438.27 | $5,675,786.99 |
| Rank 7of 7 | BLADE LEVEL UP/OVERLAY AND PAVEMENT EDGE REPAIR | ZAVALA | 2018-03-07 | $3,313,571.46 | $2,366,031.43 |
| Low bidof 3 | INSTALL DEFLECTION WALLS,PAINT AND_SEAL JOINTS | HIDALGO | 2018-03-06 | $1,104,702.01 | $1,104,702.01 |
| Rank 5of 7 | BASE,ACP,GRADE,STR,SIGN,PAVMRK | WEBB | 2018-03-06 | $2,025,542.45 | $1,521,454.71 |
| Rank 5of 7 | REHABILITATE PAVEMENT | CAMERON | 2018-03-06 | $3,828,310.64 | $3,399,954.24 |
| Rank 3of 5 | BPM | HIDALGO | 2018-03-06 | $862,927.50 | $827,634.40 |
| Low bidof 8 | HMAC OV AND SPOT BASE REPAIR | KAUFMAN | 2018-02-01 | $1,757,483.92 | $1,757,483.92 |
| Rank 2of 4 | CONSTRUCT NB FRONTAGE ROAD OVERPASSES | CAMERON | 2017-12-05 | $10,789,846.29 | $10,510,081.90 |
| Rank 5of 5 | REHABILITATION OF EXISTING ROAD | MARTIN | 2017-11-03 | $9,002,154.86 | $5,784,004.91 |
| Rank 2of 3 | OVERLAY OF NORTH AND SOUTH_BOUND LANES | BROOKS | 2017-11-03 | $2,736,486.22 | $2,511,870.22 |
| Rank 2of 3 | PAVEMENT REPAIR | HIDALGO | 2017-10-04 | $4,336,054.90 | $4,016,934.13 |
| Rank 8of 11 | ACP OVERLAY | COMANCHE | 2017-10-03 | $1,199,769.82 | $918,207.81 |
| Rank 4of 7 | REHABILITATE ROADWAY (SUPER 2) | HIDALGO | 2017-10-03 | $12,877,978.12 | $12,133,439.10 |
| Rank 2of 6 | OVERLAY | GRAYSON | 2017-08-09 | $1,837,616.74 | $1,696,316.58 |
| Low bidof 4 | ACP OVERLAY WORK | HIDALGO | 2017-08-09 | $4,485,273.80 | $4,485,273.80 |
| Rank 2of 4 | WIDEN TO 4 LANE DIVIDED CURB AND GUTTER | HIDALGO | 2017-08-08 | $10,671,306.59 | $10,446,130.30 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.