Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
127 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Low bidof 4 | REPLACE OFF-SYSTEM BRIDGE | HIDALGO | 2017-08-08 | $1,033,763.03 | $1,033,763.03 |
| Rank 4of 7 | FLBS PVMT REPAIR, LEVEL UP, SEALCOAT & PVMT MRKS | KAUFMAN | 2017-08-08 | $1,529,354.64 | $1,419,580.25 |
| Low bidof 6 | BASE REPAIR,LEVEL UP,OVERLAY | KAUFMAN | 2017-08-08 | $2,389,678.40 | $2,389,678.40 |
| Rank 2of 5 | FLEXIBLE PAVEMENT STRUCTURE REPAIR AND OVERLAY | KAUFMAN | 2017-07-12 | $2,884,343.00 | $2,604,374.00 |
| Rank 5of 6 | KEENE POT HOLE REPAIR FY17 | JOHNSON | 2017-07-11 | $2,254,000.00 | $1,728,825.00 |
| Rank 2of 2 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | COLLIN | 2017-07-11 | $1,297,267.00 | $1,194,668.00 |
| Rank 6of 6 | MILL AND OVERLAY | PARKER | 2017-05-02 | $1,991,827.70 | $1,697,511.95 |
| Rank 4of 7 | WIDEN TO 4 LANE UNDIVIDED C&G | CAMERON | 2017-04-05 | $4,783,867.95 | $4,313,269.70 |
| Rank 5of 7 | ASPHALT CONCRETE PAVEMENT OVERLAY | MENARD | 2017-04-05 | $2,213,772.87 | $1,881,273.20 |
| Rank 3of 8 | RECONSTRUCT ROADWAY | EASTLAND | 2017-04-05 | $727,356.80 | $712,723.50 |
| Low bidof 12 | RESTORATION | CALLAHAN | 2017-03-08 | $1,793,913.92 | $1,793,913.92 |
| Rank 2of 4 | ACP OVERLAY AND PAV MRKS | MAVERICK | 2017-03-08 | $6,666,666.66 | $6,593,233.70 |
| Low bidof 6 | PLANING, BS RPR, OCST, PFC SURF, PV MK | SMITH | 2017-03-08 | $1,789,204.91 | $1,789,204.91 |
| Low bidof 5 | MILL, OVERLAY AND SIGNAL WORK | ERATH | 2017-03-07 | $4,655,723.69 | $4,655,723.69 |
| Rank 2of 6 | SURF TRT, ACP SURF, MBGF, PVMT MRKG | RUSK | 2017-03-07 | $4,703,308.26 | $4,670,549.69 |
| Rank 11of 12 | REPLACE BRIDGE AND APPROACHES | LIVE OAK | 2017-03-07 | $1,104,193.00 | $649,190.68 |
| Rank 2of 5 | THIN OVERLAY MIXTURE, PAV MRKS | WEBB | 2017-02-03 | $8,310,944.30 | $7,537,201.74 |
| Low bidof 7 | BRIDGE REPLACEMENTS,BASE,SURFACING | DIMMIT | 2017-02-02 | $4,902,990.18 | $4,902,990.18 |
| Rank 3of 7 | CONSTRUCT AUXILIARY LANES | DEWITT | 2017-01-05 | $11,498,372.42 | $10,180,818.69 |
| Rank 2of 8 | MILL, HOTMIX INLAY | LUBBOCK | 2017-01-05 | $8,168,688.01 | $7,340,564.16 |
| Low bidof 10 | REHABILITATE EXISTING ROADWAY | BROWN | 2017-01-04 | $3,342,055.98 | $3,342,055.98 |
| Low bidof 6 | RECONSTRUCTION AND WIDENING | HIDALGO | 2017-01-04 | $5,206,108.37 | $5,206,108.37 |
| Rank 9of 9 | CONST. SIDEWALKS, RAMPS AND CURBS | CAMERON | 2017-01-04 | $4,916,715.87 | $3,452,509.19 |
| Rank 6of 7 | PAVEMENT REPAIR AND RESURFACING | GONZALES | 2016-12-01 | $4,502,044.43 | $3,460,417.80 |
| Rank 4of 6 | REHABILITATION OF EXISTING ROADWAY | HIDALGO | 2016-12-01 | $9,841,438.26 | $8,889,677.69 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.