Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
305 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 3of 3 | REPAIR OF FLEXIBLE PAVEMENT | BRAZORIA | 2018-08-14 | $337,852.00 | $236,830.00 |
| Low bidof 6 | PROVIDE ADDITIONAL PAVED SURFACE | BURNET | 2018-08-08 | $6,179,469.06 | $6,179,469.06 |
| Rank 2of 6 | BASE REPAIR, OCST, LEVEL UP, OV | MONTGOMERY | 2018-08-08 | $3,273,870.89 | $3,164,972.67 |
| Rank 2of 5 | SAFETY TREAT FIXED OBJECTS | GONZALES | 2018-08-07 | $2,396,348.61 | $2,179,041.09 |
| Rank 2of 8 | REHABILITATE EXISTING ROAD | BRAZOS | 2018-08-07 | $2,889,236.78 | $2,816,987.76 |
| Low bidof 4 | SAFETY TREAT FIXED OBJECTS | FAYETTE | 2018-07-11 | $2,098,141.37 | $2,098,141.37 |
| Rank 4of 4 | BASE REPAIR, OCST, LEVEL UP, OVERLAY | MONTGOMERY | 2018-07-11 | $1,994,120.58 | $1,738,187.35 |
| Rank 3of 7 | LEVEL-UP AND SEAL COAT | BURNET | 2018-07-11 | $1,995,866.35 | $1,963,009.89 |
| Rank 2of 6 | PROVIDE ADDITIONAL PAVED SURFACE | BURNET | 2018-07-10 | $3,083,196.99 | $2,692,128.55 |
| Rank 4of 5 | BASE REPAIR, PLANING, ACP OL, SIGNING & PVMT MARK | FORT BEND | 2018-07-10 | $1,828,544.51 | $1,518,766.78 |
| Rank 4of 4 | SAFETY TREAT FIXED OBJECTS | LAVACA | 2018-07-10 | $1,985,132.50 | $1,147,696.00 |
| Rank 2of 4 | HMA MILL AND INLAY | BRAZOS | 2018-06-06 | $666,104.00 | $629,253.10 |
| Low bidof 4 | HMA MILL AND INLAY | WALKER | 2018-06-06 | $642,696.00 | $642,696.00 |
| Low bidof 5 | HMA MILL AND INLAY | WASHINGTON | 2018-06-06 | $616,781.00 | $616,781.00 |
| Rank 3of 5 | SPOT BASE REPAIR | BRAZOS | 2018-06-05 | $857,952.50 | $802,085.00 |
| Rank 3of 6 | SPOT BASE REPAIR | WALKER | 2018-06-05 | $858,127.50 | $799,315.00 |
| Rank 3of 5 | SPOT BASE REPAIR | WASHINGTON | 2018-06-05 | $845,037.50 | $766,590.00 |
| Rank 3of 4 | MILL AND INLAY | BRAZOS | 2018-06-05 | $3,797,664.47 | $2,477,766.49 |
| Rank 5of 8 | REPAIR, LEVEL-UP & SEAL COAT | LEE | 2018-05-02 | $1,598,601.48 | $1,244,148.05 |
| Rank 4of 5 | OVERLAY AND PAVEMENT REPAIR | LIBERTY | 2018-05-01 | $861,075.72 | $797,673.48 |
| Low bidof 4 | PROVIDE ADDITIONAL SURFACE_WIDTH | CHAMBERS | 2018-04-04 | $328,471.82 | $328,471.82 |
| Rank 6of 6 | LENGTHEN LEFT TURN LANE | WILLIAMSON | 2018-04-03 | $179,994.04 | $110,817.60 |
| Rank 5of 5 | ADD LEFT TURN LANE | MCLENNAN | 2018-04-03 | $559,255.45 | $342,755.30 |
| Rank 4of 4 | OVERLAY | CHAMBERS | 2018-03-07 | $966,691.57 | $839,543.27 |
| Rank 2of 7 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH | TYLER | 2018-03-06 | $532,126.30 | $509,224.47 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.