Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
305 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 3of 5 | LEVEL-UP/OVERLAY | LIBERTY | 2018-03-06 | $912,062.55 | $845,384.55 |
| Low bidof 7 | MILL AND OVERLAY | MONTGOMERY | 2018-03-06 | $551,281.48 | $551,281.48 |
| Low bidof 4 | FLEXIBLE PAVEMENT STRUCTURE REPAIRS | JEFFERSON | 2018-03-06 | $537,909.00 | $537,909.00 |
| Rank 3of 6 | ONE COURSE SURFACE TREATMENT | WILLIAMSON | 2018-02-02 | $1,668,960.78 | $1,408,397.94 |
| Rank 2of 5 | OVERLAY ROADWAY | ORANGE | 2018-02-02 | $1,079,343.65 | $999,987.47 |
| Low bidof 3 | INST TN LNS,SHLDR WDEN ,MILL OL&PV | HARRIS | 2018-02-01 | $234,040.68 | $234,040.68 |
| Rank 3of 4 | INSTALL TURN LANE, PASSING LANES & RUMBLE STRIPS | LIBERTY | 2018-02-01 | $5,787,236.61 | $5,234,742.15 |
| Rank 2of 5 | US 190 ETC FLEX PAVE STRUCTURE REP | JASPER | 2018-02-01 | $565,292.95 | $562,947.48 |
| Rank 2of 5 | MILL AND OVERLAY | LIBERTY | 2018-02-01 | $1,066,641.43 | $1,042,370.70 |
| Rank 4of 9 | ON CALL PAVEMENT REPAIRS | GONZALES | 2017-11-03 | $3,298,349.00 | $2,619,288.78 |
| Low bidof 7 | ON CALL SPOT REPAIRS | GONZALES | 2017-11-02 | $792,950.00 | $792,950.00 |
| Rank 3of 6 | BASE REPAIR AND OVERLAY | FORT BEND | 2017-10-04 | $887,884.75 | $851,224.00 |
| Rank 3of 3 | SEAL COAT | MCLENNAN | 2017-10-03 | $1,283,018.60 | $993,657.54 |
| Rank 4of 4 | SEAL COAT AND HMA OVERLAY | BURLESON | 2017-10-03 | $1,367,383.20 | $1,023,189.87 |
| Low bidof 3 | HAULING ROADWAY MATERIAL | JEFFERSON | 2017-09-12 | $189,150.00 | $189,150.00 |
| Low bidof 12 | REHABILITATE EXISTING ROAD | MILAM | 2017-09-07 | $1,428,673.97 | $1,428,673.97 |
| Rank 3of 4 | OVERLAY, PLANING, MBGF, BRIDGE RAIL | LEON | 2017-09-07 | $2,443,166.55 | $2,153,409.70 |
| Rank 2of 3 | WIDEN 2 LANES TO 4 LANES UNDIVIDED | MONTGOMERY | 2017-08-09 | $1,167,908.37 | $1,126,255.63 |
| Rank 2of 4 | ADD RIGHT TURN LANES | HARRIS | 2017-08-09 | $382,637.28 | $345,345.91 |
| Rank 6of 8 | SAFETY TREAT FIXED OBJECTS | GONZALES | 2017-08-09 | $4,762,188.98 | $4,044,139.15 |
| Rank 6of 8 | SPOT BASE REPAIR | BRAZOS | 2017-08-09 | $1,066,015.00 | $816,109.50 |
| Rank 2of 5 | OVERLAY | LIBERTY | 2017-08-09 | $648,662.97 | $605,866.50 |
| Rank 4of 6 | OVERLAY | GRIMES | 2017-08-08 | $2,353,010.89 | $2,078,724.66 |
| Rank 2of 2 | ASPHALT PAVEMENT REPAIR | WALLER | 2017-08-08 | $914,900.00 | $521,960.00 |
| Rank 2of 4 | HMA MILL AND INLAY | WASHINGTON | 2017-08-08 | $698,763.00 | $648,765.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.