Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
305 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 2of 5 | HMA MILL AND INLAY | BRAZOS | 2017-07-12 | $705,414.50 | $687,930.00 |
| Low bidof 5 | HMA MILL AND INLAY | WALKER | 2017-07-12 | $672,700.00 | $672,700.00 |
| Rank 3of 5 | SPOT BASE REPAIR | WASHINGTON | 2017-07-12 | $867,690.00 | $850,911.00 |
| Rank 5of 7 | RESTORE ROADWAY | AUSTIN | 2017-07-11 | $4,673,832.11 | $4,469,341.79 |
| Rank 2of 6 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH | JASPER | 2017-07-11 | $509,602.30 | $499,477.50 |
| Rank 3of 4 | SPOT BASE REPAIR | WALKER | 2017-07-11 | $933,464.00 | $878,327.50 |
| Low bidof 4 | OVERLAY EXISTING ROADWAY | LIBERTY | 2017-06-07 | $1,050,836.68 | $1,050,836.68 |
| Rank 4of 6 | BASE FAILURE PAVEMENT REPAIR | CORYELL | 2017-06-07 | $370,242.00 | $305,221.20 |
| Rank 5of 8 | BASE FAILURE PAVEMENT REPAIR | HAMILTON | 2017-06-06 | $713,902.00 | $510,941.81 |
| Rank 3of 5 | FLEXIBLE PAVEMENT STRUCTURE REPAIR | TYLER | 2017-04-05 | $639,996.10 | $532,282.70 |
| Rank 5of 6 | SPOT BASE REPAIR | ROBERTSON | 2017-03-08 | $873,525.00 | $657,725.00 |
| Rank 3of 4 | CONVERT 4 LANE UNDIVIDED TO SUPER 2 WITH SHOULDERS | BURNET | 2017-03-07 | $1,680,061.72 | $1,383,923.15 |
| Rank 3of 3 | MILL AND INLAY | WALKER | 2017-03-07 | $561,736.96 | $477,154.44 |
| Rank 2of 2 | TRAFFIC SAFETY IMPROVEMENT, CLOSE CROSSOVER | WALLER | 2017-01-05 | $187,587.14 | $181,056.63 |
| Low bidof 4 | HMA MILL AND INLAY | WALKER | 2017-01-05 | $616,698.00 | $616,698.00 |
| Low bidof 4 | HMA MILL AND INLAY | WASHINGTON | 2017-01-05 | $633,250.00 | $633,250.00 |
| Rank 3of 5 | SPOT BASE REPAIR | LEON | 2017-01-05 | $743,850.00 | $692,725.00 |
| Rank 5of 6 | SPOT BASE REPAIR | GRIMES | 2017-01-05 | $813,975.00 | $694,650.00 |
| Low bidof 8 | FLEXIBLE PAVEMENT REPAIRS | HARDIN | 2017-01-05 | $1,166,409.50 | $1,166,409.50 |
| Rank 4of 5 | MILL AND INLAY | MILAM | 2017-01-04 | $1,443,779.99 | $1,068,368.40 |
| Low bidof 2 | OVERLAY OF EXISTING ROADWAY | LIBERTY | 2016-12-06 | $192,805.00 | $192,805.00 |
| Rank 7of 8 | WIDEN BRIDGE AND APPROACHES | FAYETTE | 2016-12-01 | $1,354,184.00 | $831,842.18 |
| Rank 3of 6 | WIDEN, REPAIR AND SEAL COAT | LEE | 2016-12-01 | $2,905,801.67 | $2,468,925.07 |
| Rank 7of 9 | SOIL STABILIZATION AND RIPRAP | FAYETTE | 2016-12-01 | $1,033,115.50 | $781,891.40 |
| Rank 4of 5 | ROADWAY RESTORATION | MADISON | 2016-12-01 | $1,533,031.75 | $1,331,516.98 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.