Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
334 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 7of 7 | CONSTRUCT RAMPS | HARRIS | 2019-09-05 | $6,243,916.44 | $4,637,319.22 |
| Rank 3of 3 | GUARD FENCE & CABLE REPAIR | DALLAS | 2019-09-05 | $10,962,417.77 | $5,695,050.00 |
| Rank 5of 5 | INSTALL MEDIAN BARRIER | WHARTON | 2019-08-07 | $6,147,634.37 | $3,284,618.30 |
| Rank 4of 4 | GR, BS, DR, PAV | JOHNSON | 2019-08-07 | $6,041,396.01 | $4,345,364.38 |
| Rank 2of 5 | PREVENTATIVE MAINTENANCE | TARRANT | 2019-08-06 | $7,084,305.86 | $6,436,651.58 |
| Rank 3of 3 | SWEEPING & DEBRIS REMOVAL | KAUFMAN | 2019-08-06 | $2,732,349.70 | $1,208,013.86 |
| Rank 4of 4 | SIGS, CHEV, BR RAIL, GRDRL, MRKS | DALLAS | 2019-06-04 | $5,269,656.73 | $4,663,152.50 |
| Rank 5of 6 | REPLACE GUARDRAIL | TARRANT | 2019-06-04 | $5,632,611.71 | $4,081,763.15 |
| Low bidof 4 | INSTALL MEDIAN CABLE AND CONCRETE BARRIER | KAUFMAN | 2019-06-04 | $4,110,939.65 | $4,110,939.65 |
| Rank 6of 10 | INSTALL CABLE BARRIERS | NAVARRO | 2019-05-08 | $6,373,000.43 | $4,889,741.00 |
| Rank 2of 10 | INSTALL MEDIAN CONCRETE BARRIERS | DENTON | 2019-04-03 | $3,193,921.80 | $3,179,440.56 |
| Low bidof 3 | CONVERT MEDIAN BARRIER | TARRANT | 2019-04-02 | $2,096,043.23 | $2,096,043.23 |
| Rank 2of 4 | REPAIR OF SLOPE FAILURE | BRAZORIA | 2019-03-06 | $832,175.75 | $777,123.20 |
| Rank 2of 6 | REPAIR SLOPE FAILURES | HARRIS | 2019-03-06 | $3,196,494.41 | $2,794,172.98 |
| Rank 6of 6 | FULL DEPTH CONCRETE REPAIR | COLLIN | 2019-03-05 | $3,005,883.47 | $1,923,008.00 |
| Rank 4of 7 | UGRADE STORM SEWERS | HARRIS | 2019-02-06 | $1,554,578.62 | $1,159,846.86 |
| Rank 6of 6 | FULL DEPTH CONC. PAV REPAIR & PAV MARK ON EB FR RD | DALLAS | 2019-02-05 | $1,789,586.28 | $1,381,125.50 |
| Rank 5of 7 | BRIDGE REPAIR | DALLAS | 2019-02-05 | $440,250.02 | $335,030.00 |
| Low bidof 2 | GR, BS, DR, PAV | PARKER | 2019-01-09 | $3,434,712.21 | $3,434,712.21 |
| Rank 7of 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH | ROCKWALL | 2019-01-09 | $3,769,795.46 | $2,753,944.73 |
| Rank 4of 4 | FULL DEPTH CONCRETE REPAIR | DALLAS | 2019-01-09 | $1,795,063.95 | $1,336,467.90 |
| Rank 8of 12 | CONSTRUCT SIDEWALKS | HARRIS | 2019-01-08 | $3,468,679.57 | $2,789,052.50 |
| Rank 5of 6 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH | COLLIN | 2019-01-08 | $3,180,187.92 | $2,436,804.35 |
| Low bidof 7 | INSTALL RAISED MEDIAN | COLLIN | 2018-08-08 | $5,260,480.17 | $5,260,480.17 |
| Rank 3of 6 | EROSION REP AND CHANNEL PROTECTION | HARRIS | 2018-08-07 | $1,989,598.53 | $1,785,427.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.