Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
334 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 4of 6 | BRIDGE PREVENTATIVE MAINTENANCE | TARRANT | 2018-07-11 | $971,994.27 | $798,329.86 |
| Rank 7of 7 | MISCELLANEOUS CONCRETE REPAIR | DALLAS | 2018-07-11 | $573,029.99 | $324,270.00 |
| Rank 6of 6 | CONSTRUCTION OF SHARED USE PATH | HARRIS | 2018-04-04 | $2,569,929.15 | $1,764,011.10 |
| Rank 7of 7 | BASE,ACP,GRADE,STR,SIGN,PAVMRK | WEBB | 2018-03-06 | $2,575,146.46 | $1,521,454.71 |
| Low bidof 7 | SLOPE FAILURE REPAIR | DALLAS | 2018-03-06 | $6,021,376.81 | $6,021,376.81 |
| Rank 5of 5 | REHABILITATION OF EXISTING ROAD | CLAY | 2018-02-02 | $3,559,517.92 | $2,307,479.20 |
| Rank 8of 8 | BASE RPR, MILL, OVERLAY, PAVMT MARK | PARKER | 2018-02-02 | $4,231,664.75 | $2,047,763.19 |
| Rank 6of 6 | REHABILITATION OF EXISTING ROAD | LAMAR | 2018-02-02 | $3,489,422.56 | $2,376,096.44 |
| Rank 15of 18 | REPLACE BRIDGE AND APPROACHES | COLLIN | 2018-02-01 | $3,177,839.10 | $1,885,537.10 |
| Rank 4of 4 | REHABILITATION OF EXISTING ROAD | LAMAR | 2018-02-01 | $3,248,021.48 | $2,447,924.56 |
| Rank 6of 8 | REPLACE BRIDGE AND APPROACHES | CORYELL | 2018-02-01 | $1,358,470.61 | $1,048,921.12 |
| Rank 6of 8 | CONSTRUCT CURB RAMPS | LAMAR | 2018-02-01 | $3,464,248.79 | $2,370,334.00 |
| Rank 11of 13 | REPLACE BRIDGE AND APPROACHES | NAVARRO | 2017-12-06 | $3,750,864.12 | $2,595,949.99 |
| Rank 3of 3 | SAFETY TREAT FIXED OBJECTS | AUSTIN | 2017-12-06 | $1,348,976.96 | $1,049,635.30 |
| Rank 8of 9 | UPGRADE MBGF AND SAFETY TREAT FIXED OBJECTS | WILLIAMSON | 2017-12-05 | $1,936,228.41 | $1,248,578.84 |
| Rank 5of 7 | GR, BS, REMOVE STRM SWR & PAV | HARRIS | 2017-11-03 | $5,070,015.33 | $3,745,731.35 |
| Rank 9of 9 | CONSTRUCT 6 TO 8 FT SIDEWALK | HARRIS | 2017-11-03 | $756,948.70 | $486,999.66 |
| Rank 8of 8 | GR, BS AND PAVEMENT | HOOD | 2017-10-04 | $3,690,804.67 | $2,113,790.10 |
| Rank 10of 12 | REPLACE BRIDGE AND APPROACHES | HARRIS | 2017-10-04 | $4,576,082.07 | $3,815,251.20 |
| Rank 4of 4 | LANDSCAPE ENHANCEMENT | HARRIS | 2017-09-07 | $1,253,796.94 | $593,717.97 |
| Rank 2of 4 | INSTALL PROTECTION | DALLAS | 2017-07-12 | $3,906,946.86 | $3,522,310.63 |
| Rank 6of 6 | LANDSCAPE TREATMENT OF RIGHT OF WAY MEDIANS | DALLAS | 2017-06-07 | $2,798,942.27 | $1,750,000.00 |
| Rank 2of 3 | INSTALL MBGF/SGTS | HARRIS | 2017-04-05 | $619,179.49 | $554,115.50 |
| Rank 6of 7 | REHABILITATION OF EXISTING HIGHWAY | LASALLE | 2017-04-04 | $2,667,673.54 | $1,622,860.21 |
| Rank 4of 7 | SAFETY TREAT FIXED OBJECTS | MATAGORDA | 2017-04-04 | $4,437,080.40 | $3,844,068.35 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.