Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
334 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 4of 4 | CONSTRUCT CURB RAMPS AND SIDEWALKS | HIDALGO | 2017-03-08 | $2,548,309.48 | $1,608,279.03 |
| Rank 3of 3 | WATER BLAST BARRIER AND WALLS | COLLIN | 2017-03-08 | $1,036,987.88 | $682,700.60 |
| Rank 5of 6 | RECONSTRUCT ROADS AND CAMPSITES | FREESTONE | 2017-02-03 | $2,234,496.51 | $1,862,429.04 |
| Rank 6of 8 | SFTY TR FX OBJS | MONTGOMERY | 2017-02-02 | $1,756,521.88 | $978,908.20 |
| Rank 3of 3 | SAFE PATH SIDEWALK PROJECT | DUVAL | 2017-01-05 | $1,639,361.36 | $1,157,974.50 |
| Rank 5of 6 | CONSTRUCT CURB RAMPS | TARRANT | 2017-01-05 | $2,216,838.53 | $1,617,402.20 |
| Rank 3of 4 | CONSTRUCTING CURB RAMPS | WEBB | 2017-01-04 | $2,298,873.34 | $1,680,038.50 |
| Rank 5of 8 | CONSTRUCT PEDESTRIAN BRIDGE OVER US 90 | BEXAR | 2017-01-04 | $2,895,136.17 | $2,331,043.05 |
| Rank 10of 11 | RAMP RELOCATION | FORT BEND | 2016-12-01 | $3,054,071.92 | $2,297,994.98 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.