Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
111 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Low bidof 2 | PUMP STATION & DRAINAGE SYSTEM CLEANING | MIDLAND | 2022-04-12 | $236,560.00 | $236,560.00 |
| Rank 3of 3 | PUMP STATION & DRAINAGE SYSTEM CLEANING | HARRIS | 2022-03-08 | $270,600.50 | $245,112.50 |
| Rank 5of 7 | SMALL SIGN REPLACEMENT | ECTOR | 2022-02-08 | $280,230.00 | $203,950.00 |
| Rank 2of 2 | PUMP STATION MAINTENANCE AND REPAIRS | JEFFERSON | 2021-11-18 | $114,956.00 | $107,105.00 |
| Rank 2of 3 | SAND (MATERIAL ONLY) | EL PASO | 2021-11-09 | $90,650.00 | $69,401.00 |
| Low bidof 3 | STORM SEWER AND DRAIN INLET CLEANING | DALLAS | 2021-09-02 | $337,981.00 | $337,981.00 |
| Rank 3of 8 | SMALL SIGN REPLACEMENT | MENARD | 2021-08-25 | $232,017.75 | $187,410.20 |
| Rank 3of 3 | CABLE BARRIER REPAIR | MIDLAND | 2021-08-10 | $492,500.00 | $322,150.00 |
| Rank 2of 3 | CULVERT CLEANING | ORANGE | 2021-08-10 | $275,850.00 | $168,500.00 |
| Low bidof 3 | CABLE MEDIAN BARRIER SYSTEM REPAIR | POTTER | 2021-08-05 | $335,300.00 | $335,300.00 |
| Rank 2of 3 | METAL BEAM GUARD FENCE REPAIR | POTTER | 2021-07-28 | $306,455.00 | $257,535.00 |
| Rank 2of 3 | PUMP STATION AND DRAIN SYSTEM CLEANING | WALLER | 2021-01-12 | $245,415.00 | $196,675.00 |
| Rank 3of 3 | ROADWAY SWEEPING | MIDLAND | 2021-01-08 | $657,949.80 | $545,204.10 |
| Rank 3of 3 | CLEANING AND SWEEPING HIGHWAYS | MOORE | 2020-11-18 | $245,460.00 | $184,030.00 |
| Low bidof 2 | LIME (MATERIAL ONLY) | EL PASO | 2020-10-22 | $7,500.00 | $7,500.00 |
| Rank 2of 2 | LIME (MATERIALS ONLY) | BREWSTER | 2020-10-22 | $15,000.00 | $12,800.00 |
| Rank 3of 3 | CLEANING AND SWEEPING HIGHWAYS | GRAY | 2020-10-20 | $174,247.40 | $128,658.16 |
| Rank 2of 3 | BRINE MATERIALS ONLY | PECOS | 2020-09-22 | $32,500.00 | $12,400.00 |
| Rank 2of 3 | BRINE(SQ)(MATERIALS ONLY) | ECTOR | 2020-09-22 | $32,500.00 | $16,700.00 |
| Rank 2of 3 | BRINE (SQ) (MATERIALS ONLY) | MIDLAND | 2020-09-22 | $32,500.00 | $15,700.00 |
| Rank 3of 3 | FLEXIBLE BASE (MATERIALS ONLY) | HARTLEY | 2020-03-23 | $199,000.00 | $149,750.00 |
| Low bidof 2 | PUMP STATION & DRAINAGE SYSTEM CLEANING | HARRIS | 2020-03-13 | $257,660.00 | $257,660.00 |
| Rank 8of 9 | DEBRIS REMOVAL | RUNNELS | 2020-01-23 | $84,790.00 | $55,031.25 |
| Rank 7of 9 | BRUSH REMOVAL | PECOS | 2020-01-14 | $220,670.50 | $149,651.95 |
| Rank 4of 10 | SMALL SIGN INSTALLATION | PARMER | 2019-09-05 | $396,710.00 | $373,870.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.