Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
111 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 4of 12 | SMALL SIGN INSTALLATION | FLOYD | 2019-09-05 | $299,055.00 | $280,850.00 |
| Rank 3of 7 | SMALL SIGN REPLACEMENT (CALLOUT) | MIDLAND | 2019-08-13 | $196,000.00 | $183,530.00 |
| Rank 3of 6 | SMALL SIGN REPLACEMENT (CALLOUT) | ECTOR | 2019-08-13 | $196,000.00 | $183,530.00 |
| Rank 3of 3 | STREET SWEEPING | ECTOR | 2019-04-03 | $399,500.73 | $370,044.00 |
| Low bidof 3 | CLEANING AND SWEEPING OF HIGHWAYS | TOM GREEN | 2019-03-27 | $314,832.80 | $314,832.80 |
| Rank 2of 3 | BRUSH REMOVAL/DRAINAGE EASEMENT CLEANING | ECTOR | 2019-02-12 | $225,650.00 | $167,765.00 |
| Low bidof 2 | CULVERT CLEANING | ECTOR | 2019-02-12 | $97,500.00 | $97,500.00 |
| Rank 2of 2 | PUMP STATION & DRAINAGE SYSTEM CLEANING | HARRIS | 2019-02-12 | $363,725.00 | $239,993.75 |
| Rank 7of 7 | TREE AND BRUSH REMOVAL AND TRIMMING | NAVARRO | 2019-02-05 | $397,905.00 | $276,986.00 |
| Rank 2of 2 | LANDSCAPE MAINTENANCE | PECOS | 2018-04-10 | $102,990.80 | $83,008.40 |
| Low bidof 1 | PUMP STATION MAINTENANCE | MIDLAND | 2018-04-10 | $200,204.00 | $200,204.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.