Texas DOT vendor directory and published bid history
Vendor source checked · TxDOT vendor source ↗
96 matched projects
| Position | Project | County | Bid date | Published bid | Low bid |
|---|---|---|---|---|---|
| Rank 3of 4 | FULL DEPTH CONCRETE REPAIR | GRAYSON | 2020-07-09 | $746,547.50 | $683,911.25 |
| Rank 2of 4 | SITE SPECIFIC FULL DEPTH CONCRETE REPAIR | HOPKINS | 2020-07-08 | $1,487,711.00 | $1,413,270.10 |
| Rank 2of 4 | FULL DEPTH CONCRETE REPAIRS | COLLIN | 2020-05-08 | $2,724,052.00 | $2,150,063.50 |
| Rank 5of 6 | NON-SITE SPEC SPALL & FULL DEPTH REPAIR | MCLENNAN | 2020-04-09 | $344,750.00 | $221,600.00 |
| Low bidof 2 | CALLOUT CONCRETE PAVEMENT REPAIR | BOWIE | 2020-03-04 | $5,399,700.00 | $5,399,700.00 |
| Low bidof 2 | ON-CALL CONCRETE AND PAVEMENT REPAIR | WICHITA | 2020-02-06 | $839,711.00 | $839,711.00 |
| Rank 3of 3 | JOINT REPAIR | POLK | 2020-01-29 | $244,700.00 | $105,420.00 |
| Rank 3of 5 | FULL DEPTH CONCRETE REPAIR | ROCKWALL | 2020-01-09 | $1,071,750.00 | $971,300.00 |
| Rank 6of 7 | BPM - BRIDGE JOINT REPAIR | DENTON | 2019-07-10 | $937,438.00 | $555,904.00 |
| Rank 3of 3 | BRIDGE REPAIR AND FULL DEPTH CONCRETE REPAIR | GRAYSON | 2019-07-10 | $824,591.00 | $741,270.00 |
| Low bidof 2 | REHABILITATE EXISTING ROADWAY | LUBBOCK | 2019-06-05 | $1,274,328.50 | $1,274,328.50 |
| Rank 3of 4 | FULL DEPTH CONCRETE REPAIR | DENTON | 2019-06-05 | $888,255.52 | $626,903.20 |
| Low bidof 7 | BPM - BRIDGE BEAM/DECK REPAIR | HOPKINS | 2019-03-21 | $197,280.00 | $197,280.00 |
| Rank 4of 4 | INSTALL SIDEWALKS | WILBARGER | 2019-03-05 | $892,862.80 | $739,514.50 |
| Rank 5of 6 | FULL DEPTH CONCRETE REPAIR | COLLIN | 2019-03-05 | $2,497,231.72 | $1,923,008.00 |
| Rank 8of 8 | CONCRETE CURB AND FLUME | HUNT | 2019-02-14 | $263,830.25 | $196,127.75 |
| Rank 3of 4 | CLEAN AND SEAL EXISTING RIGID CONCRETE PAVEMENT JO | JEFFERSON | 2018-11-06 | $499,473.18 | $276,279.68 |
| Rank 4of 4 | CALL OUT CONCRETE PAV REPAIR | WHEELER | 2018-10-03 | $1,484,500.00 | $975,435.00 |
| Low bidof 7 | FULL DEPTH CONCRETE REPAIR | NAVARRO | 2018-09-07 | $723,471.00 | $723,471.00 |
| Rank 2of 4 | CRCP REPAIR | LUBBOCK | 2018-09-06 | $1,397,083.60 | $1,273,974.55 |
| Rank 5of 5 | CONCRETE PAVEMENT REPAIR | TARRANT | 2018-08-08 | $2,498,100.00 | $1,777,800.00 |
| Rank 3of 6 | BRIDGE REPAIR AND FULL DEPTH CONCRETE REPAIR | GRAYSON | 2018-07-11 | $942,360.00 | $876,910.00 |
| Rank 5of 7 | DRAINAGE IMPROVEMENT | GRAYSON | 2018-04-19 | $248,505.00 | $192,575.00 |
| Rank 5of 9 | CONCRETE FULL DEPTH REPAIR | DENTON | 2018-04-03 | $3,049,672.86 | $2,203,011.05 |
| Rank 8of 11 | BPM-ABUTMENT EROSION REPAIR | GRAYSON | 2018-03-22 | $129,119.00 | $95,594.00 |
Source: published TxDOT bid tabs. History matches the exact official vendor name and case variants; punctuation and similarly named firms remain separate. Different spellings or name changes may leave relevant bids unmatched. Low bid is a published position, not a separately verified agency award.